BLD-Final | 5/7/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Jim Sly
|
|
|
Late afternoon -- Bob Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/7/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 5/4/2012 | 5/7/2012 | 5/8/2012 | P | NR |
Jim Sly
|
|
|
bob Phone #: ###-####
|
FIRE-Final Inspection | 5/4/2012 | 5/7/2012 | 5/7/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide remote annunciation per IMC 606.4.1. And then provide functional testing for sutdown verification.
|
FIRE-Conference | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | DONE |
Forrest France
|
|
|
On site discussion with contractor regarding items needed for final fire life safety approvals including fire code review note details such as premise identification, signage at the main entry/exit, PFE locations, max occupant load signs, smoke detection for HVAC units over 2000 cfm, project schedule, etc.
|
BLD-Other | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | PASS |
Jim Sly
|
|
|
above grid ceilig insp//Bob Goodwin Phone #: ###-####
|
BLD-Other | 3/20/2012 | 3/20/2012 | 3/20/2012 | P | PASS |
Jim Sly
|
|
|
BOB Phone #: ###-#### Int shear walls OK
|
BLD-Energy code compliance | 3/19/2012 | 3/19/2012 | 3/19/2012 | P | PASS |
Jim Sly
|
|
|
Bob Goodwin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2012 | 3/15/2012 | 3/15/2012 | A | PASS |
Jim Sly
|
|
|
BOB Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2012 | 3/13/2012 | 3/13/2012 | P | NR |
Jim Sly
|
|
|
Sheer wall also -- Bob Phone #: ###-####
|
BLD-Concrete | 2/9/2012 | 2/9/2012 | 2/9/2012 | P | PASS |
Jim Sly
|
|
|
concrete stem walls//Bob Goodwin Phone #: ###-####
|
BLD-Footing | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 2/7/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Jim Sly
|
|
|
Concrete at 3 -- Bob Phone #: ###-####
|