Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-01192
StatusFinaled
Name JC CONSTRUCTORS
Site Address 2076 S CENTURY WAY
Project NameOXARC INC
Customer Number 
ePlanReviewNo
Description
(OXARC INC) *** 1-12-2012 PLAN MODIFICATION TO INCLUDE: REPLACE THE EXISTING EXTERIOR METAL SIDING WITH NEW METAL SIDING; REPLACE THE EXISTING EXTERIOR CONCRETE PAD WITH A NEW PAD FOR LARGE TANKS; REPLACE THE EXISTING CONCRETE STEPS AT THE MAIN ENTRANCE WITH PRE-ENGINEERED METAL STAIRS; INSTALL NEW BOLLARDS AT THE EXISTING OVERHEAD DOOR LOCATIONS; AND INSTALL A CONCRETE SCREEN ENCLOSURE FOR THE PROPANE TANKS. SRZ*** Remodel for a new tenant in an existing 10,520 sq. ft. building per approved plans. Building is 8,000 sq. ft. with a 2,520 covered dock area. Tenant use is for retail, filling, and storage of compressed gases with some office. NOTE: This building was originally constructed in Ada County and annexed into Boise City in 2002. Work to include: demolition work including the removal of an existing mezzanine per plans; construction of interior partitions walls creating; individual office areas, open office area, warehouse space, showroom, gas filling space, extinguisher area, charging room, hydro room, break room, electrical room, janitor room, and two new fully accessible restroom; install a new dual height (hi-lo) accessible drinking fountain; installation of a new storefront entry system; installation of new slot wall system on specific walls; new sales counter; new ADA ramp and dock area; installation of new suspended acoustical ceiling system; upgrade the lighting layout; interior finishes in compliance with chapter 8 of the 2009 IBC; new mechanical, new plumbing, and new electrical work; and all other work per the approved plans, attached plan review report, and all other reviewing agencies approvals. NOTE: This building will be fully fire sprinklered for area increase. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection5/10/20125/11/20125/11/2012APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final5/11/20125/11/20125/11/2012PPASS
DetailsTom Arcoraci
nate Phone #: ###-####
BLD-Final4/18/20124/19/20124/19/2012ADONE
DetailsTom Arcoraci
Nate Phone #: ###-####
BLD-Final4/18/20124/18/20124/18/2012PPASS
DetailsTom Arcoraci
Nate Phone #: ###-#### ok for temp occ
FIRE-Final Inspection4/16/20124/17/20124/17/2012APART
DetailsTroy Cobbley
A temporary is being given for the fire life safety inspection until the bollards and parking lot is finished. This is per Romeo Gervais.
FIRE-Conference4/16/20124/16/20124/16/2012PDONE
DetailsTroy Cobbley
Met Darren and went over the signage requirement for fire dept access. I also noted that a 5,000 or 6,000 gallon carbon dioxide tank that had not been shown on the plans is now installed along the north property line. I contacted scott arellano and he was ok with the installation of the tank and no additional submittal were to be required. Darren also asked about the bollards at the north side tanks. I deferred him to the fire chief since their installation does not match IFC 318.
BLD-Final4/12/20124/12/20124/13/2012PNR
DetailsTom Arcoraci
FIRE-Final Inspection4/10/20124/12/20124/12/2012PFAIL
DetailsTroy Cobbley
(1) The vehicle protection "bollards", required per the IFC do not meet section 312.2, 1, 2 and 5 for spacing between posts, filled with concrete or 3'-0" clearance from the propane tank. (2) The LOX tank has not been installed to verify the 5'-0" clearance from the property line. (3) Provide fire dept access signage per review note #8 (4) Finish mounting the fire extinguishers. (5) Provide the missing exits signs and repair the exit discharge and interior emergency lights. (6) Mount and test the fire sprinkler exterior alarm bell (7) The fire alarm system manual pull station is mounted too high and needs to be lowered. (8) United Water has not turned on the water supply for the fire sprinkler system therefore the forward flush could not be performed or any alarms for flow tested. (9) Repair the 6" sprinkler hanger at the top of the dry pipe system that has been disconnected. There may be other items added to the list once actual testing can be performed. Per the drawings and the electrical contractor the electrical service is less than the 1,200 ampers therefore panic hardware is not required on the electrical room.
BLD-Final4/10/20124/12/20124/12/2012ANR
DetailsTom Arcoraci
nate Phone #: ###-####
BLD-Other3/14/20123/15/20123/15/2012APASS
DetailsTom Arcoraci
Grid ceiling -- Darrin Phone #: ###-####
BLD-Footing2/9/20122/10/20122/10/2012APASS
DetailsTom Arcoraci
darrin - concrete pour at 10:00 Phone #: ###-####
BLD-Conference2/1/20122/1/20122/1/2012PPASS
DetailsTom Arcoraci
eng says 2500 psi min ok for tank slab