Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-01242
StatusFinaled
Name CANYON CREST HOMES
Site Address 4153 W QUAIL HILL CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,388 sq. ft., two story (first story 2,926 sq. ft., second story 462 sq. ft.) with 4 bedrooms, 3 1/2 bathrooms, approximately 252 sq. ft. of covered patio/porch and a 1,270 sq. ft. attached garage per the approved plans, plan review report and any notations. Fire Protection: A residential modified 13D sprinkler system IS required. In addition to the requirements of NFPA 13D there shall be one additional row of sprinklers at the separation wall between the garage and living space. This structure is located in WUI zone A. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. R-1C zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/201110/25/201110/27/2011PDONE
DetailsTony Young
dave - please call for access Phone #: ###-####
BLD-Final10/25/201110/26/201110/26/2011APASS
DetailsTony Young
dave - please call for access Phone #: ###-####
DOC - Permit Finaled10/26/201110/26/201110/26/2011PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection10/24/201110/24/201110/24/2011PDONE
DetailsTerry Records
Final grading and drainage approved
BLD-Energy code compliance8/24/20118/24/20118/24/2011PPASS
DetailsTony Young
Dave-Please call prior to inspection-also please look at the correction notice items Phone #: ###-####
BLD-Framing/Rough-in8/19/20118/22/20118/22/2011PFAIL
DetailsMike Jordan
dave Phone #: ###-####. Provide TBE at bearing joint 1 on AG11. Justify boared thru bootom chord of AG1 truss. Complete foam sealing and fire blocking. ok to insuolate after fire has passed.
BLD-Wall cover8/12/20118/12/20118/12/2011PPASS
DetailsTom Arcoraci
dave - cover for exterior soffetts Phone #: ###-####
BLD-Wall cover8/9/20118/9/20118/9/2011PPASS
DetailsTony Young
Sheer inspection-Dave Phone #: ###-####,, exterior ok to cover
BLD-Framing/Rough-in8/8/20118/9/20118/9/2011APART
DetailsTony Young
Sheer inspection-Dave Phone #: ###-####,, shear ok on exterior
BLD-Other7/29/20118/8/20118/8/2011ACANC
DetailsTony Young
Sheer Wall---Dave Phone####-####-contractor called and rescheduled
BLD-Foundation7/14/20117/15/20117/15/2011APASS
DetailsJim Storey
Mana Phone #: ###-####
BLD-Foundation7/14/20117/14/20117/15/2011PPART
DetailsTony Young
Mana Phone #: ###-####,, some rebar is tied for the stem walls,, work in progress,, (note... some of the footings were dug down below the surface,, most are 10-12" thick)
BLD-Foundation7/14/20117/14/20117/15/2011PNR
DetailsTony Young
mana Phone #: ###-####
BLD-Foundation7/13/20117/14/20117/14/2011ANR
DetailsTony Young
Mana Phone #: ###-####
BLD-Footing7/13/20117/13/20117/13/2011PPART
DetailsTony Young
Mana Phone #: ###-####,, work in progress
BLD-Final7/8/20117/8/20117/8/2011PCANC
DetailsJim Sly
Brian Phone #: ###-####
BLD-Foundation7/8/20117/8/20117/8/2011PPART
DetailsJim Sly
Verified rebar in CMU retaining wall.......starting to fully grout wall.
BLD-Footing7/7/20117/7/20117/7/2011PPART
DetailsTony Young
Dave Phone #: ###-####,, retaining wall ftgs on east p/line,, work in progress
BLD-Footing7/6/20117/7/20117/7/2011ANR
DetailsTony Young
Dave Phone #: ###-####