BLD-Final | 10/25/2011 | 10/25/2011 | 10/27/2011 | P | DONE |
Tony Young
|
|
|
dave - please call for access Phone #: ###-####
|
BLD-Final | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Tony Young
|
|
|
dave - please call for access Phone #: ###-####
|
DOC - Permit Finaled | 10/26/2011 | 10/26/2011 | 10/26/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | PASS |
Tony Young
|
|
|
Dave-Please call prior to inspection-also please look at the correction notice items Phone #: ###-####
|
BLD-Framing/Rough-in | 8/19/2011 | 8/22/2011 | 8/22/2011 | P | FAIL |
Mike Jordan
|
|
|
dave Phone #: ###-####. Provide TBE at bearing joint 1 on AG11. Justify boared thru bootom chord of AG1 truss. Complete foam sealing and fire blocking. ok to insuolate after fire has passed.
|
BLD-Wall cover | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
dave - cover for exterior soffetts Phone #: ###-####
|
BLD-Wall cover | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Tony Young
|
|
|
Sheer inspection-Dave Phone #: ###-####,, exterior ok to cover
|
BLD-Framing/Rough-in | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | PART |
Tony Young
|
|
|
Sheer inspection-Dave Phone #: ###-####,, shear ok on exterior
|
BLD-Other | 7/29/2011 | 8/8/2011 | 8/8/2011 | A | CANC |
Tony Young
|
|
|
Sheer Wall---Dave Phone####-####-contractor called and rescheduled
|
BLD-Foundation | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 7/14/2011 | 7/14/2011 | 7/15/2011 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, some rebar is tied for the stem walls,, work in progress,, (note... some of the footings were dug down below the surface,, most are 10-12" thick)
|
BLD-Foundation | 7/14/2011 | 7/14/2011 | 7/15/2011 | P | NR |
Tony Young
|
|
|
mana Phone #: ###-####
|
BLD-Foundation | 7/13/2011 | 7/14/2011 | 7/14/2011 | A | NR |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, work in progress
|
BLD-Final | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | CANC |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PART |
Jim Sly
|
|
|
Verified rebar in CMU retaining wall.......starting to fully grout wall.
|
BLD-Footing | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PART |
Tony Young
|
|
|
Dave Phone #: ###-####,, retaining wall ftgs on east p/line,, work in progress
|
BLD-Footing | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | NR |
Tony Young
|
|
|
Dave Phone #: ###-####
|