Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-01268
StatusFinaled
Name INLAND IDAHO LLC
Site Address 13626 W BALDCYPRESS ST
Project NameAFFINITY - SECTION B
Customer Number 
ePlanReviewNo
Description
AFFINITY AT BOISE-Section B- Section 'B' (Center Core) PLAN MOD - 3/12/11 - ADDITION OF RESIDENTIAL RANGE, RESIDENTIAL SPRINKLERED HOOD AND EXHAUST SYSTEM, WITH ACCESSIBLE FRONT APPROACH COUNTER SPACE, WITHIN THE ORIGINAL LOBBY 180 COFFEE BAR AREA.. OPERATION AND CONNECTION OF THE EXHAUST HOOD SUPRESSION SYSTEM SHALL BE AS REGULATED BY THE FIRE DEPARTMENT. THIS UNIT IS NOT APPROVED AS TYPE I HOOD / EXHAUST SYSTEM. DRS To construct a four story 1-hour fire rated, wood frame, 66-unit, commercial apartment building of 64,558 sq. ft.(16,519 s.f. - 1st fl / 16,013 s.f. - 2 thru 4th fl.). There are 13 units @ 742 s.f.; 4 @ 553 s.f. and 28 @ 568 s.f.; 3 @ 762 s.f.; 6 @ 540 and 12 @ 457 s.f. The first floor Center Core has accessory support areas.Two (2) 2-hour combination fire walls & Horizontal exits are being constructed between the West Wing / Center Core and East Wing / Center Core portions for allowable area compliance of Center Core. There is also a 2-hour exit stair enclosure toward the west end of the Center core. This building is fully sprinkler W/ 13R system for allowable area increase, addition of 1-story and for occupancy use compliance; alarm with notification system; 1-hour exit corridors connecting the 2-hour stair enclosure and both horizontal exits; and mechanical shaft assemblies are indicated as 2-hour rated. Each floor has one exit into a rated stair enclosure and 2 exits through a horizontal exit. All work to be in accordance with the reviewed plans, red-lined notes on plans and attached plan review comments & conditions of all provided plan reviews. CUP10-00052 DRH10-00222 12/14/11 - Resubs of New Sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0 & A10.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY OF SHEETS TO JOB SITE FOR INSTALL IN FIELD COPY.
Sheets S2.3.3, S2.5.2, S2.5.3 & S5.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY TO FIELD FOR JOB SET.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20128/24/20128/24/2012PPASS
DetailsJim Sly
Ed Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/21/20128/21/20128/21/2012PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final7/3/20127/5/20127/5/2012PPART
DetailsJim Sly
rob this is for the 3rd & 4th floors Phone #: ###-####
OK for Temp Occ. 3rd and 4th floors tower 1 and 2 (A&B).
FIRE-Final Inspection7/2/20127/2/20127/2/2012PCANC
DetailsTroy Cobbley
Area "B" 3rd and 4th floors life safety will be a pass when the project related fire alarm system for this area is tested. Smoke alarms tested.
BLD-Other6/25/20126/25/20126/25/2012PPASS
DetailsJim Sly
Temporary Certificate of Occupancy Phone #: ###-#### >> Inspection requested via web by Rob Fraser
OK for Temp Occ. See prev. fire Notes.
FIRE-Conference6/14/20126/15/20126/15/2012ADONE
DetailsTroy Cobbley
The additional emergency lighting in the second floor common rooms and the first floor movie room is not going to be required per Dan Stuart in plan review.
BLD-Final6/13/20126/14/20126/14/2012PNR
DetailsJim Sly
Rob Phone #: ###-####
FIRE-Final Inspection6/13/20126/14/20126/14/2012APART
DetailsTroy Cobbley
Life safety passed in area "A" and "B", first and second floors. A temporary occupancy is given with Romeo and Scott's permission. Will need possible additional emergency lighting in the second floor common rooms and the first floor movie room. I will verify with Dan Stuart.
FIRE-Conference5/21/20125/21/20125/21/2012PDONE
DetailsTroy Cobbley
Rod and I went over life safety requirements. I went over the three options for fire dept access designation. The fire hydrant in the northwest corner of the property needs the 5" outlet turned to where it is accessible to the fire dept. A knox box needs to be provided. It appears that exit sign/emergency lights, if placed per plans, will be adequate. The "area of refuge" is noted in the fire dept review as being placed in the stairwells with the requirements for communication. Per Rod the "area of refuge" is in the main corridor. I deferred that any changes will need to be requested through Scott Arellano in plan review. I suggested that the architect become involved.
FIRE-Conference4/27/20124/27/20124/27/2012PDONE
DetailsTroy Cobbley
The standpipe hose valves located on all of the floors at the fire wall per the sprinkler plans were to be mounted recessed in the corridor walls. They have been installed surface mounted on the walls and are possibly encroaching into the egress path. After speaking to Dan Stuart, I spoke to the job site superintendant about having the architect submit to the plan reviewer for approval of this installation.
BLD-Framing/Rough-in4/3/20124/3/20124/3/2012PPART
DetailsJim Sly
2 hr wall in the attic//Rob Fraser ###-####
Need to look at soffit on South side of tower 2.
BLD-Framing/Rough-in3/6/20123/7/20123/7/2012PPASS
DetailsJim Sly
Cover inspection for rooms: 118, 119, 120, 221, 222, 223, 224, 325, 326, 327, 426, 427, Electrical Room #1 (159), Mechanical Room #1 (162), Elevator Equipment Room #1. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in3/1/20123/2/20123/2/2012PPASS
DetailsJim Sly
Inspection for pre-rock ceilings for Commons Area on 1st floor. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/27/20122/28/20122/28/2012PPASS
DetailsJim Sly
Energy code inspection (insulation) for units: 421, 422, 423, 424, 425, 321, 322, 323, 324, 325. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in2/26/20122/27/20122/27/2012PPASS
DetailsJim Sly
Rough-in and fire-caulking inspection for units: 421, 422, 423, 424, 425, 321, 322, 323, 324, 325 Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/16/20122/17/20122/17/2012PPASS
DetailsJim Sly
Energy code compliance inspection for units 113, 114, 115, 116, 117, 217, 218, 219, 220. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in2/16/20122/17/20122/17/2012APASS
DetailsJim Sly
Rough-in and fire-caulk cover inspection for the following units: 113, 114, 115, 116, 117, 217, 218, 219, 220, Elevator Shaft #2, Common Area Rooms - 459, 359, 259. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Conference2/16/20122/16/20122/16/2012PPASS
DetailsJim Sly
Energy and fire-caulking inspection for units 217-220. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/16/20122/16/20122/16/2012PPASS
DetailsJim Sly
rob - units 213-216 Phone #: ###-####
BLD-Conference2/10/20122/13/20122/13/2012PNR
DetailsJim Sly
Energy and fire-caulk inspection for units 417-420 & 317-320. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/9/20122/9/20122/9/2012PPASS
DetailsJim Sly
Units 413 thru 416 and 313 thru 316 for energy compliance and fire-caulking. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance2/7/20122/8/20122/8/2012PPART
DetailsJim Sly
Energy and fire-caulk inspection for units 413 through 420, Tower 2. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
Fire caulk not ready.....Shaft wall at top of elevator 1.....OK.
BLD-Framing/Rough-in1/19/20121/20/20121/20/2012PNR
DetailsJim Sly
Rough-in framing inspection for 4th floor south. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
Complete firestopping
BLD-Framing/Rough-in1/13/20121/17/20121/17/2012ANR
DetailsJim Sly
Inspect elevator shaft #1 for cover. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Other1/10/20121/10/20121/10/2012PPART
DetailsJim Sly
ROB Phone #: ###-####
Exterior shear nailing....Tower 2 West 1/2 of South wall and North wall west 1/2. OK
BLD-Other12/21/201112/22/201112/22/2011APASS
DetailsJim Sly
Shear nailing for walls and rated ceilings. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
shear walls 3rd flr 28/29
BLD-Framing/Rough-in12/6/201112/7/201112/7/2011APART
DetailsJim Sly
Partial---Ed Phone #: ###-####
Insp of 2 shear walls 3rd floor center West. OK
BLD-Other11/17/201111/21/201111/21/2011APASS
DetailsJim Sly
shear nail insp//Rob ###-####
3rd story West wing shear walls (north).
BLD-Foundation9/29/20119/30/20119/30/2011APART
DetailsJim Sly
Rob Phone #: ###-####
Center wing....Wall. MTI on site.
BLD-Footing9/28/20119/28/20119/28/2011PPART
DetailsJim Sly
rob Phone #: ###-####
Center wing....footing and wall sections. OK pending MTI insp, tests and approvals.
BLD-Footing9/27/20119/27/20119/28/2011PPART
DetailsJim Sly
Rob Phone #: ###-####
Center wing...MTI on site.
BLD-Foundation9/23/20119/23/20119/26/2011PPART
DetailsJim Sly
Rob Phone #: ###-####
Select walls Middle wing OK pending MTI tests, inspections and approvals.