Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-01269
StatusFinaled
Name INLAND IDAHO LLC
Site Address 13626 W BALDCYPRESS ST
Project NameAFFINITY - SECTION C
Customer Number 
ePlanReviewNo
Description
AFFINITY AT BOISE-Section C- Section 'C' (East Wing) to construct a four story 1-hour fire rated, wood frame, 52-unit, commercial apartment building of 46,938 sq. ft.(11,685 s.f. - 1st fl / 11,751 s.f. - 2nd thru 4th fl.). There are 18 units @742 s.f.; 1 @ 759 s.f.; 12 @ 553 s.f. and 12 @ 568 s.f.. 4 @ 731 s.f.; 5 @ 762 s.f. A 2-hour combination fire wall & Horizontal exit is being constructed between the East Wing and Center Core portion for allowable area compliance. This building is fully sprinkler W/ 13R system for allowable area increase, addition of 1-story and for occupancy use compliance; alarm with notification system; 1-hour exit corridors connecting the 2-hour stair enclosure and horizontal exit; and mechanical shaft assemblies are indicated as 2-hour rated. Each floor has one exit into a rated stair enclosure and 1 exit through a horizontal exit. All work to be in accordance with the reviewed plans, red-lined notes on plans and attached plan review comments & conditions of all provided plan reviews. CUP10-00052 DRH10-00222 12/14/11 - New Sheets A2.5.1, A2.5.2, A2.5.3, A4.3, A4.5, A8.0, A8.1, A10.0 & A10.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY OF SHEETS TO JOB SITE FOR INSTALL IN FIELD COPY.
Sheets S2.3.3, S2.5.2, S2.5.3 & S5.1 SUBMITTED 11/18/11 INSERTED INTO OFFICE COPY OF PLANS AND COPY TO FIELD FOR JOB SET.



See FIR11-00563 for fire sprinkler plan review -TRF
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/24/20128/24/20128/24/2012PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final8/24/20128/24/20128/24/2012PPASS
DetailsJim Sly
OK for Perm Occ.
FIRE-Alarm Testing8/24/20128/24/20128/24/2012PDONE
DetailsTroy Cobbley
Alarm testing was previously completed.
BLD-Final8/6/20128/10/20128/10/2012APART
DetailsJim Sly
ROB Phone #: ###-####
Temp Occ OK for 1st and 2nd floors bldg C (tower 3)
FIRE-Final Inspection8/9/20128/10/20128/10/2012APART
DetailsTroy Cobbley
Life safety has passed in area "C" first and second floors. To final this building the signage needs to be provided at the fire control room doors and the fire alarm permit finaled.
FIRE-Final Inspection8/6/20128/9/20128/9/2012PFAIL
DetailsTroy Cobbley
Second floor of area "C" life safety passed but the first floor still has sprinkler pendants taped off and smoke alarms with covers on so it could not pass
BLD-Final8/2/20128/3/20128/3/2012PPART
DetailsJim Sly
occ for 3rd flr//Rob Phone #: ###-####
Temp Occ. OK for 3rd floor ....Tower 3.
FIRE-Final Inspection8/2/20128/3/20128/3/2012APASS
DetailsTroy Cobbley
Life safety passed for the 3rd floor of area "C"
BLD-Final7/27/20127/27/20127/27/2012PPART
DetailsJim Sly
4th Floor Temp Occupancy Inspection Phone #: ###-#### >> Inspection requested via web by Rob Fraser
OK for Temp Occ. of 4th floor only.
BLD-Final7/25/20127/27/20127/27/2012ANR
DetailsJim Sly
Inspection for 3rd and 4th floors of Tower 3. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
FIRE-Final Inspection7/27/20127/27/20127/27/2012PPART
DetailsTroy Cobbley
The life safety for the 4th floor Area "C" passed.
BLD-Final7/25/20127/26/20127/27/2012PNR
DetailsJim Sly
Final inspection for 4th floor Tower 3. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
FIRE-Alarm Testing7/24/20127/24/20127/24/2012PDONE
DetailsTroy Cobbley
Todays test was for the smoke alarms for the third floors of Area "C". The smoke alarms passed testing. The fourth floor could not be tested due to capet work in the corridor.
FIRE-Conference6/27/20126/28/20126/28/2012ADONE
DetailsTroy Cobbley
Todays inspection was for fire life safety for 3rd and 4th floors of Tower 1 and Tower 2. Items needing completed are smoke alarm testing for tower 2 for both the third and fourth floors due to covers still being in place on the smoke alarms. Also there are still protective tape on several sprinkler heads. A smoke alarm in one bedroom of room 302 did not activate the other smoke alarms.
FIRE-Conference5/21/20125/21/20125/21/2012PDONE
DetailsTroy Cobbley
Rod and I went over life safety requirements. I went over the three options for fire dept access designation. The fire hydrant in the northwest corner of the property needs the 5" outlet turned to where it is accessible to the fire dept. A knox box needs to be provided. It appears that exit sign/emergency lights, if placed per plans, will be adequate. The "area of refuge" is noted in the fire dept review as being placed in the stairwells with the requirements for communication. Per Rod the "area of refuge" is in the main corridor. I deferred that any changes will need to be requested through Scott Arellano in plan review. I suggested that the architect become involved.
BLD-Framing/Rough-in4/27/20124/30/20124/30/2012APASS
DetailsJim Sly
Cover inspection for 1st floor units of Tower 3. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
FIRE-Conference4/27/20124/27/20124/27/2012PDONE
DetailsTroy Cobbley
The standpipe hose valves located on all of the floors at the fire wall per the sprinkler plans were to be mounted recessed in the corridor walls. They have been installed surface mounted on the walls and are possibly encroaching into the egress path. After speaking to Dan Stuart, I spoke to the job site superintendant about having the architect submit to the plan reviewer for approval of this installation.
BLD-Conference4/23/20124/24/20124/25/2012PPASS
DetailsJim Sly
Cover inspection for 1st, 2nd, 3rd, 4th floors for corridor rated ceilings. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Conference4/23/20124/24/20124/24/2012AFAIL
DetailsJim Sly
Cover inspection for 1st, 2nd, 3rd, and 4th floor corridor rated ceilings. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
Need to complete fire caulking.
BLD-Wall cover4/19/20124/19/20124/20/2012PNR
DetailsJim Sly
Inspection for cover for 1st, 2nd, 3rd, 4th floor corridor ceilings for Tower 3 (Building C). Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in4/12/20124/13/20124/15/2012PPASS
DetailsJim Sly
Inspection for all units on 3rd and 2nd floor in Building C - "Tower 3" for cover. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in4/11/20124/11/20124/11/2012PCANC
DetailsJim Sly
Rob phone
BLD-Energy code compliance4/10/20124/10/20124/11/2012APASS
DetailsJim Sly
Fire caulking and energy compliance inspection for cover: Units 435, 436, 437, 438, 439, 440. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Energy code compliance4/9/20124/10/20124/10/2012PNR
DetailsMike Jordan
Fire caulking and energy compliance inspection for cover: Units 435, 436, 437, 438, 439, 440. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Framing/Rough-in4/3/20124/4/20124/4/2012APASS
DetailsJim Sly
corridor 5 rm# 479//Rob Phone #: ###-####
BLD-Other3/20/20123/20/20123/20/2012PPASS
DetailsJim Sly
rob - cover inspection for unit 428, 429, 430, 431, 432, 433, and 434 - also 184 and 186 Phone #: ###-####
BLD-Foundation10/3/201110/3/201110/3/2011PPART
DetailsMike Jordan
frazier - wall - pouring at 2 Phone #: ###-####. Work in progress on stemwalls. Will have special inspection.