BLD-Final | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Jim Sly
|
|
|
late as possible//Ed Cuttlers Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/30/2012 | 8/31/2012 | 8/31/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. Contractor to post max. occupant load signage per plan as discussed. PFE's posted where indicated.
|
FIRE-Conference | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | DONE |
Troy Cobbley
|
|
|
Rod and I went over life safety requirements. I went over the three options for fire dept access designation. The fire hydrant in the northwest corner of the property needs the 5" outlet turned to where it is accessible to the fire dept. It appears that exit sign/emergency lights, if placed per plans, will be adequate.
|
BLD-Framing/Rough-in | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PASS |
Jim Sly
|
|
|
Rob Fraser ###-#### 4th floor corridor Tower 3
|
BLD-Framing/Rough-in | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Jim Sly
|
|
|
Nailing inspection for Pool House exterior walls. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
|
BLD-Foundation | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PART |
Jim Sly
|
|
|
ROB Phone #: ###-#### Wall for Poolhouse......OK pending MTI inspections, tests and approvals.
|