Permit Number | BLD11-01344 |
Status | Finaled |
Name |
HC COMPANY INC
|
Site Address |
11311 W CHINDEN BLVD
|
Project Name | HP BLDG 3 |
Customer Number | |
ePlanReview | No |
Description |
(HEWLETT PACKARD)(PHASE II CAFE' - SERVERY REMODEL) Remodel to the existing dining / preparation assembly use cafeteria per approved plans. Work to include select interior demolition. Modification of existing kitchen area to become a large servery area for patrons to pass through selecting food and beverage choices before going to the seating areas. Modifications to the existing 1-hour roof/ceiling assembly (ESR-1222)and 1-hour occupancy separation wall separating the original A2.1 assembly dining / kitchen area accessory use area per the UBC under which remodels & upgrades were done, from the adjacent two story 'B' occupancy office building. Building 1, 2, 3, 5, & 7 of the Hewlet Packard campus are part of an unlimited area building as a 'B' occupancy use with 60 feet all around and fully sprinklered. The A2.1 dining / kitchen area was required to be of type II-1 hour constrcution and an accessory use to building three. All modifications to roof/ceiling assembly, penetrations and openings are to be such that the 1-hour construction is maintained. drs
|