Permit Information
Permit NumberBLD11-01396
StatusFinaled
Name CM COMPANY
Site Address 705 S 8TH ST
Project NameBIOMARK
Customer Number 
ePlanReviewNo
Description
(BIOMARK BUILDING RENOVATION) (10-27-11 PLAN MODIFICATION TO RECONSTRUCT THE 24’ X 60’ CANOPY LOCATED ON THE SOUTH SIDE OF THE BUILDING. WORK INCLUDES NEW WOOD COLUMNS, NEW WOOD ROOF JOISTS, NEW WOOD STRUCTURAL SHEATHING, AND PERHAPS A NEW 3” X 12” WOOD LEDGER ATTACHED WITH HILTI KWIK BOLT TZ ANCHORS. SPECIAL INSPECTION IS REQUIRED FOR THE CONCRETE ANCHORS.) This building will be fire sprinklered for building area and for fire area. To remodel the 17,697 square foot 1st story (14,714 square feet inside, 1,490 square feet under a canopy, and 1,493 square feet under another canopy) of an existing building and prepare it for a new office and fabrication/work tenant. This building will be fully fire sprinklered in conjunction with this permit. Although a compliant egress system will be provided from the basement, the basement is not approved for general occupancy under this permit. The fire riser room and a mechanical room will be located in the basement and are approved to be accessed and used. Work is to include interior nonbearing walls, 2 multi-user restrooms and one single-user restroom all accessible to the disabled, a shower/dressing room accessible to the disabled, 2-hr fire-resistance-rated wall infills in the North exterior wall located at a property line, interior steel and concrete stairways, exterior concrete stairways and ramp, new exterior windows and doors, new interior windows and doors, and a new 2-hr fire-resistance-rated wall with parapet next to the North property line at the canopy. In addition, structural work includes steel supports for the existing concrete floor at new basement stairwell openings in the floor, steel headers at new or expanded openings in the exterior walls, structural roof changes at the new skylights, and seismic ties between the roof diaphragm and the exterior walls. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/8/20126/8/20126/15/2012 DONE
DetailsDave Hannah
BLD-Final6/13/20126/15/20126/14/2012PPASS
DetailsDave Hannah
Perm Occupancy
BLD-Aging Inspection3/19/20123/19/20123/27/2012 PASS
DetailsDave Hannah
FIRE-Final Inspection12/30/20111/3/20121/3/2012APASS
DetailsForrest France
C/N items verified for completion, project related FIR permits approved for final. Discussed rack storage requirements per IFC with contractor.
BLD-Final12/22/201112/23/201112/23/2011PPART
DetailsDave Hannah
Tom Phone #: ###-#### ok for temp occ ok for perm occ after fire gos perm
FIRE-Final Inspection12/22/201112/23/201112/23/2011APART
DetailsForrest France
Temp. occupancy approved per agreements with contractor and R. Gervais. Final pending fire alarm installation matching approved plan modification.
FIRE-Final Inspection12/21/201112/22/201112/22/2011AFAIL
DetailsForrest France
Correction items for fire life safety approvals include; exit door hardware at four locations, missing EM lighting at two areas, project related fire alarm and sprinkler permit finals.
BLD-Final12/20/201112/21/201112/22/2011PFAIL
DetailsDave Hannah
tom Phone #: ###-#### need other trades finaled needs failproof door hardwear on exit doors needs handrails and gaurd rails
BLD-Other12/7/201112/7/201112/8/2011PPART
DetailsDave Hannah
ceiling grid//Tom Phone #: ###-####6 ok after all other trades ok
FIRE-Conference11/18/201111/18/201111/18/2011ADONE
DetailsForrest France
Regarding FDC clearance
BLD-Other11/14/201111/14/201111/15/2011PPASS
DetailsDave Hannah
Tom Phone #: ###-#### framing of the canopy south end of bld ok
BLD-Concrete11/3/201111/3/201111/3/2011PPASS
DetailsJim Storey
Concrete---Dan ###-#### grout under stair posts ok
BLD-Other10/20/201110/21/201110/21/2011APASS
DetailsDave Hannah
Stem Wall--Tom ###-#### ada ramp and stairs ext
BLD-Footing10/20/201110/20/201110/20/2011APASS
DetailsDave Hannah
TOM ###-####
BLD-Framing/Rough-in10/12/201110/13/201110/13/2011APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in10/11/201110/12/201110/12/2011APART
DetailsDave Hannah
Tom ###-####
BLD-Foundation10/11/201110/12/201110/12/2011APASS
DetailsDave Hannah
tom ###-#### ok to pour loading dock walls
BLD-Footing10/7/201110/10/201110/10/2011APASS
DetailsJim Storey
Tom ###-####
BLD-Framing/Rough-in10/4/201110/4/201110/5/2011PPART
DetailsDave Hannah
Tom Phone #: ###-#### ok to cover offices on north eng of project
BLD-Footing10/3/201110/4/201110/4/2011APASS
DetailsDave Hannah
Tom Phone #: ###-####