BLD-Final | 9/22/2011 | 9/30/2011 | 9/30/2011 | P | PASS |
Jim Storey
|
|
|
Please call 1hr prior for access----Mandy Phone #: ###-####/// Exhaust system removed from plans 8/10-11 by Tim W. No MEC needed///cdp
|
FIRE-Final Inspection | 9/28/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Forrest France
|
|
|
C/N items finished. Fire life safety inspection passed.
|
FIRE-Final Inspection | 9/22/2011 | 9/27/2011 | 9/28/2011 | P | FAIL |
Forrest France
|
|
|
Correction items include; install approved hardware at both restroom doors, provide current certification tags on the PFE's at the east building, project related fire alarm permit final pending. Remainder of inspection items passed.
|
FIRE-Final Inspection | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | NR |
Forrest France
|
|
|
Final pending project related fire alarm.
|
FIRE-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 | A | DONE |
Forrest France
|
|
|
Conversation with owner and architect regarding fire code review notes, key notes per plan, fire alarm and sprinkler work, correction items, etc.
|
BLD-Final | 7/29/2011 | 8/1/2011 | 8/2/2011 | P | CANC |
Jim Storey
|
|
|
Mandy Phone #: ###-####
|
FIRE-Final Inspection | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | FAIL |
Forrest France
|
|
|
Project is not in condition for fire life safety final. See fire code review notes # 3, 5 and 20. Reference also stamped plan set sheet A.1.1 keynote items 1, 7, 8, and 17. Separate fire alarm and sprinkler permits will be necessary to complete modifications. Noted overdue certifications for the fire extinguishers, door hardware is not compliant, missing exit signs and EM lights per plans, etc.
|