BLD-Final | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Tom Arcoraci
|
|
|
eric Phone #: ###-####
|
FIRE-Final Inspection | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PASS |
Forrest France
|
|
|
C/N items finished. Fire life safety final approved.
|
FIRE-Final Inspection | 10/4/2012 | 10/9/2012 | 10/9/2012 | P | PART |
Forrest France
|
|
|
One exit sign, two EM lights repaired while on site. Door hardware revisions at the main entry/exits underway. Project related fire sprinkler permit final pending. Remainder of fire life safety items passed.
|
BLD-Other | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PASS |
Dave Hannah
|
|
|
eric - ceiling Phone #: ###-####
|
FIRE-Conference | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | DONE |
Forrest France
|
|
|
Regarding PFE locations, electrical permit, exit signs and EM lights, and project related FIR permits.
|
BLD-Conference | 8/22/2012 | 8/24/2012 | 8/24/2012 | A | DONE |
Dave Hannah
|
|
|
Eric Phone #: ###-#### ok for wal greens to stock store
|
FIRE-Conference | 8/23/2012 | 8/23/2012 | 8/23/2012 | A | DONE |
Forrest France
|
|
|
Eric phone #: ###-####
|
FIRE-Conference | 7/24/2012 | 7/24/2012 | 7/25/2012 | P | DONE |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 7/18/2012 | 7/18/2012 | 7/18/2012 | P | NR |
Dave Hannah
|
|
|
Eriic Biggs-Ceiling Grid inspection please Phone #: ###-####
|
FIRE-Conference | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | DONE |
Forrest France
|
|
|
On site visit with contractor regarding IFC section 912 regarding FDC location.
|
BLD-Framing/Rough-in | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | NR |
Dave Hannah
|
|
|
Building Final - Please call Steve Ove ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis
|
BLD-Framing/Rough-in | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PART |
Dave Hannah
|
|
|
VAUGHAN Phone #: ###-#### ext wall for elec room ok to cover
|
BLD-Framing/Rough-in | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Mike Jordan
|
|
|
von Phone #: ###-####. Framing for dirve through canopy structure at pharmacy.
|
BLD-Footing | 4/4/2012 | 4/5/2012 | 4/5/2012 | A | PART |
Dave Hannah
|
|
|
late am//rebar for footing//Vaughn Phone #: ###-####
|
BLD-Other | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | CANC |
Dave Hannah
|
|
|
Rebar steel/Grout -- Vaughn Phone #: ###-####
|
BLD-Concrete | 3/2/2012 | 3/5/2012 | 3/5/2012 | A | DEFR |
Dave Hannah
|
|
|
Von-Re-bar inspection--Late am please Phone #: ###-#### mti on site talked with matt all going well
|
BLD-Other | 2/29/2012 | 3/1/2012 | 3/5/2012 | A | DONE |
Dave Hannah
|
|
|
grout and rebar insp// Vaughn Phone #: ###-####
|
BLD-Other | 2/1/2012 | 2/2/2012 | 2/2/2012 | P | PASS |
Tom Arcoraci
|
|
|
wants around 2pm//grout rebar insp for cmu wall//vaughn Phone #: ###-#### spec inspection
|
BLD-Other | 1/31/2012 | 2/1/2012 | 2/1/2012 | A | PART |
Jim Storey
|
|
|
vaugh - grout and rebar - mid-morning please Phone #: ###-#### placed with si in staff meetting all morning.
|
BLD-Other | 1/27/2012 | 1/30/2012 | 2/1/2012 | A | PART |
Dave Hannah
|
|
|
late am//block insp for rebar and grout exterior only//Vaughn Phone #: ###-####mti on site
|
BLD-Other | 1/20/2012 | 1/23/2012 | 1/23/2012 | P | CANC |
Dave Hannah
|
|
|
Grout & Re-Bar inspection please ###-#### Von
|
BLD-Other | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | DONE |
Dave Hannah
|
|
|
request about 10//rebar for concrete wall//Vaughn Phone #: ###-####
|
BLD-Concrete | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | PART |
Dave Hannah
|
|
|
bob - footing rebar - late morning please Phone #: ###-####
|