Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-01802
StatusFinaled
Name VISSER BUILDING CO
Site Address 165 W THORNBERRY CT
Project Name 
Customer Number 
ePlanReviewNo
Description
***"2-10-2012 THIS PROJECT IS MODIFIED TO REFLECT THAT THE NEW GARAGE ROR THIS PERMIT IS TO BE CONVERTED TO LIVING SPACE AND ADDING A DOORWAY FROM THE NEW "STUDIO" MASTER BEDROOM HALL. aDDED VALUE TO THIS PROJECT IS $5,082.00) pep 2-10-2012 ****This project is for the addition of 559s.f. of living space, 88s.f. of exterior above grade deck area and 382s.f. of single care garage to the south west end of the existing 2949s.f. 3-story single family dwelling in the R-1B- WUI - foothills zone with R-1B setbacks approved by Joan Johnson. Fullyfire sprinklered per Hackberry # 3 plat notes. Separate electrical, pumbing, mechanical and ESC permits are required. All per the approved plans as marked, soils aand structural engineering details with engineer's calculations along with the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201212/5/201212/5/2012APASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Robert Hunter
// done
DOC - Permit Finaled12/5/201212/5/201212/5/2012PPASS
DetailsTony Young
done
BLD-Final4/9/20124/9/20124/9/2012PPEND
DetailsTony Young
Bob Phone #: ###-####,, need final letter from archtect/engineer as ok as built,, all else ok
BLD-Conference4/3/20124/3/20124/3/2012PPART
DetailsTony Young
bob Phone #: ###-####,, ?s on final
BLD-Wall cover12/20/201112/20/201112/20/2011PPASS
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Robert Hunter,, energy code ok
BLD-Energy code compliance12/15/201112/16/201112/19/2011PPART
DetailsTony Young
work in progress,, ok to cover ceiling when ready,,, sprinkler is passed
BLD-Framing/Rough-in12/15/201112/16/201112/16/2011APART
DetailsTony Young
bob Phone #: ###-####,, ok to insulate pending sprinkler rough pass
BLD-Framing/Rough-in12/14/201112/15/201112/15/2011APART
DetailsTony Young
bob Phone #: ###-####,,, frame ok pending
BLD-Energy code compliance12/14/201112/14/201112/14/2011PNR
DetailsTony Young
bob Phone #: ###-####
BLD-Conference12/1/201112/1/201112/2/2011PPART
DetailsTony Young
Bob Phone #: ###-####,, flue vs. top plate ?s
BLD-Framing/Rough-in11/28/201111/28/201111/28/2011PPART
DetailsTony Young
Shear inspection please-Bob Phone #: ###-####,,, exterior shear ok
BLD-Foundation11/3/201111/4/201111/4/2011AFAIL
DetailsMike Jordan
bob Phone #: ###-#### Approved plans call for special inspection for masonry, concrete and steel. Cleanouts are required for grout lifts exceeding 5ft. in height, Also clean out all mortar fins. Noted that p[lans show to grout solid only cells with reinforcement, no grout stop in wall was noted, Needs to check with engineer to ensure that steel beam will hold the additional weight of the grout. Correction notice posted, also spoke to project super about corrections.
BLD-Foundation10/14/201110/17/201110/17/2011APASS
DetailsTony Young
bob Phone #: ###-####
BLD-Foundation9/1/20119/1/20119/1/2011PPART
DetailsTony Young
jay Phone #: ###-####
BLD-Footing8/24/20118/25/20118/25/2011APASS
DetailsTony Young
Jay Phone #: ###-####
BLD-Footing8/24/20118/24/20118/24/2011PNR
DetailsTony Young
Jay Phone #: ###-####,, on site conf only