BLD-Aging Inspection | 12/17/2015 | 12/17/2015 | 12/18/2015 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/18/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Dave Hannah
|
|
|
Karen Phone #: ###-####
|
DOC - Permit Finaled | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/16/2015 | 12/17/2015 | 12/18/2015 | P | NH |
Dave Hannah
|
|
|
Karen Phone #: ###-####
|
BLD-Final | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | FAIL |
Candy A. Nichols
|
|
|
after talked to David Hannah I Called Karen-she needs to call Bob A about reopening the expired permit and pay the fee then call in the electrical because it was never finaled-once the ele has passed then she can call in her building final CAN
|
DOC - Permit Expired | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 | | PASS |
Dave Hannah
|
|
|
|
BLD - Request for Extension | 3/30/2012 | 3/30/2012 | 4/2/2012 | P | PASS |
Dave Hannah
|
|
|
karen Phone #: ###-####
|
BLD-Energy code compliance | 1/20/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Dave Hannah
|
|
|
Karen ###-####
|
BLD-Framing/Rough-in | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | PART |
Dave Hannah
|
|
|
karen Phone #: ###-#### ok to insulate after elec r/i needs to resubmit plans for mod
|
BLD-Framing/Rough-in | 10/28/2011 | 10/28/2011 | 10/31/2011 | P | NR |
Dave Hannah
|
|
|
Karen Phone #: ###-#### fire place waiting on mec r/i
|
BLD-Framing/Rough-in | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Dave Hannah
|
|
|
early as poss//Karen ( ###-#### cell) Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PART |
Dave Hannah
|
|
|
karen - please call 1/2 hr prior Phone #: ###-#### ok to insulate needs fire blocking fron addition at top of furred out walls
|
BLD-Foundation | 9/9/2011 | 9/12/2011 | 9/12/2011 | A | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Foundation | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Concrete | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | PART |
Dave Hannah
|
|
|
after 10:30 //Karen Phone #: ###-#### steel columns ok
|
BLD-Footing | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | PART |
Dave Hannah
|
|
|
jared Phone #: ###-####site backs good crew still needs ti set rebar
|