FIRE-Final Inspection | 1/13/2012 | 1/13/2012 | 1/13/2012 | A | PASS |
Forrest France
|
|
|
|
FIRE-Final Inspection | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 1/11/2012 | 1/11/2012 | 1/11/2012 | A | PEND |
Forrest France
|
|
|
Final pending project related fire alarm panel repair work.
|
FIRE-Final Inspection | 12/27/2011 | 12/28/2011 | 12/28/2011 | A | NR |
Forrest France
|
|
|
Final pending project related fire alarm permit work.
|
BLD-Final | 12/28/2011 | 12/28/2011 | 12/28/2011 | P | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-#### final ok pending fire and achd sign offs.
|
FIRE-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | P | NR |
Forrest France
|
|
|
|
FIRE-Conference | 12/14/2011 | 12/14/2011 | 12/14/2011 | P | DONE |
Forrest France
|
|
|
On site conference regarding fire code review notes, life safety items, fire alarm permit application for new tamper switch monitoring at the control vavles for the fire protection DCVA, etc.
|
BLD-Framing/Rough-in | 11/17/2011 | 11/17/2011 | 11/17/2011 | P | PASS |
Jim Storey
|
|
|
dan Phone #: ###-#### water proffing verivied will check upon aplacation has begun.
|
BLD-Footing | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-#### allcolumn ftgs ok to place concrete
|