BLD-Final | 11/1/2012 | 11/1/2012 | 11/1/2012 | P | PASS |
Tony Young
|
|
|
c of o issued
|
DOC - Permit Finaled | 11/1/2012 | 11/1/2012 | 11/1/2012 | P | PASS |
Tony Young
|
|
|
|
BLD-Conference | 10/16/2012 | 10/17/2012 | 11/1/2012 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | NR |
Tony Young
|
|
|
Jerry Phone #: ###-####,, walk through only,, just need hillside final
|
BLD-Energy code compliance | 5/22/2012 | 5/22/2012 | 6/4/2012 | P | DONE |
Tony Young
|
|
|
CHRIS Phone #: ###-####
|
BLD-Framing/Rough-in | 5/29/2012 | 5/29/2012 | 6/4/2012 | P | DONE |
Tony Young
|
|
|
CHRIS Phone #: ###-####
|
BLD-Framing/Rough-in | 6/1/2012 | 6/1/2012 | 6/1/2012 | P | PASS |
Tony Young
|
|
|
CHRIS Phone #: ###-####,, frame above garage wall to roof deck
|
BLD-Energy code compliance | 5/24/2012 | 5/25/2012 | 5/29/2012 | P | PASS |
Tony Young
|
|
|
CHRIS Phone #: ###-####,, house ok,, need garage
|
BLD-Energy code compliance | 5/24/2012 | 5/24/2012 | 5/25/2012 | P | PASS |
Tony Young
|
|
|
CHRIS Phone #: ###-####
|
BLD-Energy code compliance | 5/21/2012 | 5/22/2012 | 5/23/2012 | A | PART |
Tony Young
|
|
|
CHRIS Phone #: ###-####,, need to seal some holes,, insulation ok
|
BLD-Framing/Rough-in | 5/8/2012 | 5/9/2012 | 5/10/2012 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, main level walls,, winder stair ?s
|
BLD-Framing/Rough-in | 5/7/2012 | 5/8/2012 | 5/10/2012 | A | PEND |
Tony Young
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 5/9/2012 | 5/9/2012 | 5/10/2012 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, main level walls ok to insulate,, need fireblocking,, need sprinklers signed off complete prior to cover ok
|
BLD-Energy code compliance | 5/4/2012 | 5/4/2012 | 5/4/2012 | P | PART |
Tony Young
|
|
|
chris Phone #: ###-####,,, basement ok to cover,, stairs still not per code on east side
|
BLD-Energy code compliance | 4/25/2012 | 5/3/2012 | 5/4/2012 | P | PEND |
Tony Young
|
|
|
chris Phone #: ###-####,, basement area,, pending fire sprinkler pas
|
FIRE-Conference | 4/19/2012 | 4/19/2012 | 4/19/2012 | P | DONE |
Troy Cobbley
|
|
|
Fire sprinkler plans need to be resubmitted showing all changes in routing and fitting counts prior to covering by sheet rock. I spoke to Bruce the fitter, Tony Young and with Jerry with Petra about the issues but agreed that I would allow the installation of insulation, for sound proofing, above the piping. This insulation, it was agreed would be installed above the sprinkler piping and would not obstruct my view of the sprinkler piping for the future cover inspection.
|
BLD-Framing/Rough-in | 4/12/2012 | 4/12/2012 | 4/13/2012 | P | NR |
Tony Young
|
|
|
jerry Phone #: ###-####,, basement area
|
BLD-Framing/Rough-in | 4/11/2012 | 4/11/2012 | 4/12/2012 | P | CANC |
Tony Young
|
|
|
jerry Phone #: ###-####,, basement area
|
BLD-Framing/Rough-in | 4/9/2012 | 4/11/2012 | 4/12/2012 | A | CANC |
Tony Young
|
|
|
jerry Phone #: ###-####,, basement area
|
BLD-Framing/Rough-in | 4/10/2012 | 4/10/2012 | 4/12/2012 | A | NR |
Tony Young
|
|
|
jerry Phone #: ###-####,, basement area,, conf only,, need trades
|
BLD-Framing/Rough-in | 4/6/2012 | 4/9/2012 | 4/9/2012 | P | NR |
Tony Young
|
|
|
jerry Phone #: ###-####,, need trades 1st,, walk through only,, need fireblocks,, need winder stairs to meet codes
|
BLD-Wall Bracing | 3/28/2012 | 3/28/2012 | 4/3/2012 | P | PASS |
Tony Young
|
|
|
shear panel and hold downs//Jerry Phone #: ###-####
|
BLD-Wall Bracing | 3/19/2012 | 3/19/2012 | 3/28/2012 | P | PASS |
Tony Young
|
|
|
shear panel and hold downs//Jerry Phone #: ###-####
|
BLD-Wall Bracing | 3/20/2012 | 3/20/2012 | 3/21/2012 | P | PASS |
Tony Young
|
|
|
shear panel and hold downs//Jerry Phone #: ###-####
|
BLD-Wall Bracing | 3/6/2012 | 3/8/2012 | 3/20/2012 | A | PART |
Tony Young
|
|
|
Marc Phone #: ###-####,, garage ok
|
BLD-Wall Bracing | 3/5/2012 | 3/6/2012 | 3/7/2012 | P | PART |
Tony Young
|
|
|
shear panel and hold downs//Jerry Phone #: ###-####,,, hold downs ok
|
BLD-Conference | 2/9/2012 | 2/14/2012 | 2/14/2012 | P | PART |
Tony Young
|
|
|
j.c. - conference re: framing issues Phone #: ###-####,,, double wall shear ok
|
BLD-Other | 2/9/2012 | 2/10/2012 | 2/10/2012 | A | PASS |
Tony Young
|
|
|
|
BLD-Conference | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | PART |
Tony Young
|
|
|
j.c. - conference re: framing issues Phone #: ###-####,, shear conference
|
BLD-Foundation | 12/23/2011 | 12/27/2011 | 12/27/2011 | A | PART |
Tony Young
|
|
|
GENE Phone #: ###-####,, basement walls,,, all rebar is tied,, ok to pour after form are placed
|
BLD-Other | 12/22/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Tony Young
|
|
|
GENE Phone #: ###-####,, west half of the garage north retaining wall ok
|
BLD-Footing | 12/14/2011 | 12/15/2011 | 12/15/2011 | P | PART |
Tony Young
|
|
|
gene Phone #: ###-####,, garage footings ok
|
BLD-Footing | 12/1/2011 | 12/1/2011 | 12/2/2011 | P | PEND |
Tony Young
|
|
|
Gene Ness Phone #: ###-####,, pend special inspection report
|
BLD-Footing | 11/23/2011 | 11/28/2011 | 11/28/2011 | P | PART |
Tony Young
|
|
|
Gene Phone #: ###-####,,, under slab floor footings ,, ok pending special inspections
|
BLD-Other | 11/14/2011 | 11/14/2011 | 11/15/2011 | P | PART |
Tony Young
|
|
|
rebar insp//Gene Phone #: ###-####,, south walls ok
|
BLD-Footing | 11/2/2011 | 11/3/2011 | 11/3/2011 | A | PART |
Jim Sly
|
|
|
Gene Phone #: ###-#### Footing for South walls OK.
|
BLD-Foundation | 11/2/2011 | 11/2/2011 | 11/2/2011 | P | PART |
Jim Sly
|
|
|
Re-bar inspection please-Gene Phone #: ###-#### Remainder of North and East wall OK......Contractor to verify that Geo Tech and Terry Records have approved South footing. I did not approve South footing.
|
BLD-Foundation | 10/31/2011 | 11/1/2011 | 11/1/2011 | A | PART |
Dave Hannah
|
|
|
gene Phone #: ###-#### high wall ok to close up
|
BLD-Other | 10/28/2011 | 10/31/2011 | 10/31/2011 | A | PASS |
Jim Storey
|
|
|
rebar insp//Gene Phone #: ###-####
|
BLD-Footing | 10/18/2011 | 10/20/2011 | 10/20/2011 | A | PART |
Tony Young
|
|
|
After 3pm---Frank Phone #: ###-####,, pending special inspection report
|