Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD11-02178
StatusFinaled
Name PERFORMANCE SYSTEMS INC
Site Address 11818 W JOPLIN RD
Project NamePW UV DISINFECTION FACILITY
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE PUBLIC WORKS) UV Disinfection Facility Addition (Foundation Only) To construct the concrete foundation and lower mechanical and plumbing for a 1,860 sq. ft. pre-engineered metal building addition to an existing 6,900 sq. ft. UV disinfection facility building per approved plans. New building total square footage will be 8,760 sq. ft. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file. NOTE: This building is NOT fire sprinklered.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/27/201510/27/201510/27/2015 PASS
DetailsJim Sly
DOC - Permit Finaled10/27/201510/27/201510/27/2015PPASS
DetailsJim Sly
BLD-Final2/20/20142/20/20142/20/2014PPASS
DetailsJim Sly
BLD-Final8/2/20138/5/20138/5/2013ANR
DetailsJim Sly
Need to complete all concrete on scope of work, provide final letter of approval from MTI and Engineer of record.
BLD-Final8/1/20138/2/20138/2/2013ADEFR
DetailsMike Jordan
david Phone #: ###-####
BLD-Final6/24/20136/25/20136/25/2013PCANC
DetailsJim Sly
dave Phone #: ###-####
BLD-Final6/21/20136/24/20136/24/2013ANR
DetailsJim Sly
Phone #: ###-####
Need approved plan.
FIRE-Final Inspection6/21/20136/21/20136/21/2013PPASS
DetailsForrest France
Life safety finaled.
BLD-Footing9/25/20129/25/20129/25/2012PPART
DetailsJim Sly
Dave phone
Select slab and column inbed anchor bolting.....OK pending MTI insp. tests and approvals.
BLD-Footing9/24/20129/25/20129/25/2012ACANC
DetailsJim Sly
anchor bolt insp//Dave Miller Phone #: ###-####
Re-sched.....
BLD-Concrete7/18/20127/24/20127/24/2012APART
DetailsJim Sly
Around 9am please-Dave Miller Phone #: ###-####
Select slab OK pending MTI special insp, tests and approvals.