FIRE-Final Inspection | 11/2/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 11/2/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Mike Jordan
|
|
|
Dwayne Dayley Phone #: ###-####. OK for perm occ.
|
BLD-Final | 10/19/2011 | 10/20/2011 | 10/20/2011 | P | CANC |
Jim Storey
|
|
|
Dwayne-PLease call at least 30 mins prior to inspection Phone #: ###-#### fire insp. call and had a list of c/n needed. no insp. performed until fire is resolved.
|
FIRE-Final Inspection | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit signs and emergency lighting on the first floor. Provide exit signs and emergency lighting for the main lobby. Provide exit signs and emergency lighting for the second floor. Provide monitoring for the fire sprinkler monitoring panel that has been disabled. Provide sprinkler modifications for the blocked and painted sprinkler heads. Provide resubmitted plans with floor layout that matches.
|