BLD-Final | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 8/2/2012 | 8/2/2012 | 8/3/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 7/25/2012 | 7/25/2012 | 7/25/2012 | P | FAIL |
Troy Cobbley
|
|
|
Provide address, remove the exit sign as discussed and provide revised building plans showing the fence/storage area on the west side of the building.
|
BLD-Energy code compliance | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PART |
Mike Jordan
|
|
|
RICK Phone #: ###-####. Still needs to insulate atiic area in main shop.
|
BLD-Other | 4/27/2012 | 4/27/2012 | 4/27/2012 | P | PASS |
Mike Jordan
|
|
|
Draft stops inspection-Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2012 | 4/26/2012 | 4/26/2012 | A | PASS |
Mike Jordan
|
|
|
RICK Phone #: ###-####
|
BLD-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 | P | DONE |
Mike Jordan
|
|
|
Jobsite check up. Interior slab on grade has been placed. Interior steel stud walls being contructed and trades also working. Talked to contractor about draft stops.
|
BLD-Other | 3/7/2012 | 3/8/2012 | 3/8/2012 | A | PASS |
Mike Jordan
|
|
|
mike - shear Phone #: ###-####. Roof framing and shear ok.
|
BLD-Other | 1/31/2012 | 2/2/2012 | 2/2/2012 | A | PART |
Mike Jordan
|
|
|
MAsonry. 14ft. to 16ft. elevation on north and west walls. All cells were clean and reinforcement in place as per approved plans. Special inspector on site. Contractor work ing on paperwork work for control joints on north and south rated walls. Also noted masonry contractor employing cold weather controls as per IBC.
|
BLD-Other | 1/30/2012 | 1/31/2012 | 1/31/2012 | A | PASS |
Mike Jordan
|
|
|
tom - pre-grout Phone #: ###-####. on site to review special inspection reports and masonry work in progress.
|
BLD-Conference | 1/25/2012 | 1/25/2012 | 1/25/2012 | P | PART |
Mike Jordan
|
|
|
Msonry on east and west and south wall, top of wall. Contacted contractor to have special inspector leave reports on site for review.
|
BLD-Other | 1/11/2012 | 1/12/2012 | 1/12/2012 | P | PART |
Mike Jordan
|
|
|
Pre-grout inspection please Phone #: ###-####. Work in progress. Special inspector on site. Will grout 0' to 4' elevation on west and north wall and 4' to 8' elevation on east and south wall.
|
BLD-Footing | 12/20/2011 | 12/21/2011 | 12/21/2011 | P | CANC |
Mike Jordan
|
|
|
rick Phone #: ###-####
|
BLD-Foundation | 12/21/2011 | 12/21/2011 | 12/21/2011 | P | PASS |
Mike Jordan
|
|
|
rick Phone #: ###-####
|
BLD-Footing | 12/19/2011 | 12/20/2011 | 12/20/2011 | A | PASS |
Mike Jordan
|
|
|
rick Phone #: ###-####. Perimeter footing ok.
|
BLD-Footing | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | NR |
Mike Jordan
|
|
|
rick - late morning please - pouring at 2 Phone #: ###-####. Work in progress. Inspection rescheduled for tommorrow.
|