Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-02749
StatusFinaled
Name HC COMPANY INC
Site Address 9465 W EMERALD ST Unit: 110
Project NameLIBERTY MUTUAL
Customer Number 
ePlanReviewNo
Description
(LIBERTY MUTUAL) Remodel an existing 2,650 sq. ft. office area (formerly Starbucks) in combination with removal of interior wall to expand new office for Liberty Mutual into adjoing vacant tenant space adding 1,073 sq. ft. for a total area 3,723 sq. ft. office tenant on the first floor of an existing building per approved plans. This permit is attached to the same set of plans used to create permit BLD11-02750 reducing the existing vacant tenant space area to approximately 1,908 sq. ft. vanilla finish space being created by the expansion for Liberty Mutual. Work to include select interior demolition; construction of new 29.5 ft. by full height wall to separate tenant spaces; construct interior nopn-bearing walls to create reception area, conference / small meeting / break / mail / storage / telecom / private office rooms; S.A.T. ceiling grid, bracing, new /relocated luminaries and mechanical fixtures; interior cabinetry, floor and wall finishes; interior access/egress doors, frames and hardware; modifications to electrical, plumbing, mechanical, sprinkler & alarm systems. Redline notes on approved plans and all attached plan review comments of all reviewing agencies are part of the approved plans requiring compliance. NOTE: This building is fully fire sprinklered to take advantage of special code allowances when sprinklers are provided (non-rated corridor, exit separation reduction, openings between floors, etc.). drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/24/20122/27/20122/27/2012APASS
DetailsMike Jordan
Darren Phone #: ###-####. Ok for perm occ.
BLD-Final2/6/20122/7/20122/7/2012APART
DetailsMike Jordan
darrin - please call 1/2 hr prior Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once electrical signs perm occ.
BLD-Final2/6/20122/6/20122/6/2012PNR
DetailsMike Jordan
darrin Phone #: ###-#### - please call 1/2 hr prior. Needs to reapie grid. Will recall final.
FIRE-Final Inspection2/3/20122/6/20122/6/2012APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in1/25/20121/26/20121/26/2012APART
DetailsMike Jordan
darrin - ceiling grid - please call 1/2 hr prior Phone #: ###-####/. Ok for tile after sprinkler and electrical rough in inspections have passed. Will need to confirm spacer bar placement at final along mullions.
BLD-Energy code compliance12/29/201112/30/201112/30/2011APART
DetailsJim Storey
darrin Phone #: ###-#### framing ok pending ele wall aproval.
BLD-Framing/Rough-in12/29/201112/30/201112/30/2011APART
DetailsJim Storey
darrin Phone #: ###-#### framing ok pending ele wall aproval.