BLD-Final | 4/17/2012 | 4/17/2012 | 4/17/2012 | P | PASS |
Dave Hannah
|
|
|
Deven-Please call prior to inspection Phone #: ###-#### ok for perm occ
|
BLD-Final | 2/28/2012 | 2/29/2012 | 2/29/2012 | A | PART |
Dave Hannah
|
|
|
First thing -- Craig Phone #: ###-#### ok for temp occ needs to fix ada rest room and finish mec
|
FIRE-Final Inspection | 2/28/2012 | 2/29/2012 | 2/29/2012 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire life safety inspection passed. * NOTE: Per general contractor and fire sprinkler contractor survey, head count in the building remains below 100. Therefore, conditions per the UFC under which the structure was built still apply regarding offsite monitoring.
|
FIRE-Final Inspection | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | NR |
Forrest France
|
|
|
Pending ceiling tile installation, address numbers, project related FIR permit final. Exits and EM lights tested okay.
|
BLD-Other | 2/27/2012 | 2/27/2012 | 2/28/2012 | P | PASS |
Dave Hannah
|
|
|
Above ceiling --- Craig Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 2/16/2012 | 2/16/2012 | 2/16/2012 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the grid ceilings approved for cover. Noted sprinkler head count in the building may now exceed 100.
|
BLD-Framing/Rough-in | 1/18/2012 | 1/19/2012 | 1/20/2012 | A | PASS |
Dave Hannah
|
|
|
deven Phone #: ###-#### ok to cover after elec and plumbing rough ins are completed
|