BLD-Final | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | PASS |
Dave Hannah
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 9/7/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 7/2/2012 | 7/3/2012 | 7/3/2012 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall all c/n items completed
|
BLD-Framing/Rough-in | 6/28/2012 | 6/29/2012 | 6/29/2012 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall,, correction posted,, ok to insulate
|
BLD-Wall Bracing | 6/13/2012 | 6/13/2012 | 6/13/2012 | P | PASS |
Dave Hannah
|
|
|
ok to cover grond level ext walls
|
BLD-Wall Bracing | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover second floor and ground level fire walls
|
BLD-Foundation | 5/1/2012 | 5/1/2012 | 5/1/2012 | P | PASS |
Dave Hannah
|
|
|
Eduardo Phone #: ###-####
|
BLD-Footing | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Dave Hannah
|
|
|
ALVARO Phone #: ###-####
|
BLD-Final | 4/23/2012 | 4/23/2012 | 4/23/2012 | P | NR |
Dave Hannah
|
|
|
garage code is 1212 or 1400 or 1968 sorry for the 3 diffrent codes. want to make sure u can get in. Phone #: ###-#### >> Inspection requested via web by John Dyche
|