Permit Information
Permit NumberBLD12-00075
StatusIssued
Name RSCI
Site Address 11818 W JOPLIN RD
Project NameWest Boise Wastewater Treatmen
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE PUBLIC WORKS) West Boise Wastewater Treatment Plant - To upgrade the West Boise Waste Water Treatment Facility's Headworks. The structural work includes support for the new pump drive motor at the first floor. Structural modifications to the distrbution channel including removal of the concrete floor slab above the distribution channel to access the new stop logs. Removable steel plates will be installed to maintain the walkway and allow for access to the stop logs. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection5/13/20205/13/20205/14/2020 PEND
DetailsTell Riley
BLD-Aging Inspection5/12/20205/12/20205/12/2020 PEND
DetailsTell Riley
BLD-Wall Bracing1/20/20201/21/20201/21/2020ACANC
DetailsTell Riley
We are pouring the two short return walls and the building face of the utility trench in the future building. Nothing too structural. The pour is scheduled for 11 am with MTI and and RSCI quality control both present. Phone #: ###-#### Inspection requested via web by John Cloninger
BLD-Conference1/8/20201/8/20201/8/2020PDONE
DetailsTell Riley
previous inspection on 12/30/2019 was on wrong permit number and inspection is invalid//inspection was intended for permit numberBLD19-03422//
BLD-Foundation1/7/20201/8/20201/8/2020ACANC
DetailsTell Riley
I (John Cloninger) will be out of town. Rusmir Civic will be the onsite contact - his number is listed above. The 10 am pour will include the east wall and the north wall. If weather permits the slab on grade for the tank bases will also be poured. If there is any trouble my number is ###-####. Phone #: ###-#### Inspection requested via web by John Cloninger//this is the wrong permit number and previous footing inspection under this permit number is not correct//
BLD-Concrete12/28/201912/30/201912/30/2019APART
DetailsTell Riley
A pour is planned for 9 am this is not a footer pour. The pour is for the base of the overflow containment trough that runs around two sides of the external storage tank pad. A rebar inspection was performed and passed by MTI. MTI and RSCI QC will be onsite to collect cylinders and to monitor concrete specifications. It would be a good time to visit about what kind of inspections the City wants to perform. This is a small job but there will be numerous small pours. This pour is 6cy. Phone #: ###-#### Inspection requested via web by John Cloninger//met onsite with GC//specials onsite rebar approved per specials, ok pending all specials//blankets and ground heater onsite//