BLD-Final | 4/24/2012 | 4/25/2012 | 4/25/2012 | A | PASS |
Dave Hannah
|
|
|
ROCK office # ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 4/23/2012 | 4/24/2012 | 4/24/2012 | A | PASS |
Forrest France
|
|
|
Previous correction items verified for completion. Life safety finaled.
|
FIRE-Conference | 4/4/2012 | 4/4/2012 | 4/4/2012 | A | DONE |
Forrest France
|
|
|
Regarding IFC 2009 sec. 1008.1.9.3
|
BLD-Final | 3/22/2012 | 3/23/2012 | 3/24/2012 | P | NR |
Dave Hannah
|
|
|
rock Phone #: ###-#### ok to move into the lower level area or phase one so they start phase two
|
FIRE-Final Inspection | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | FAIL |
Forrest France
|
|
|
Noted correction items include; remove manual thumbturns at the 1st floor door 101 and 2nd floor stairway exit door hall 117, post signage at landing door 100, provide egress illumination per IFC sec. 1006 and fire code plan review note #6, missing exit signs per IFC sec. 1011. Plan set does not indicate locations for EM lights/exit signage existing or new.
|
BLD-Framing/Rough-in | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | PASS |
Dave Hannah
|
|
|
Sheet rock -- Rick Phone #: ###-####
|