Permit Information
Permit NumberBLD12-00282
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 1253 N COLE RD
Project NamePEACE IN JESUS LUTHERAN CHURCH
Customer Number 
ePlanReviewYes
Description
(PEACE IN JESUS LUTHERAN CHURCH) (CUP11-00073 and CZC11-00258) The fire sprinkler system is used for building area increase and for fire area occupant load. To convert an existing 10,515 square foot building to a church. Work is to include interior nonbearing walls, furred gypsum board ceiling, new entry canopy (concrete footings, concrete piers, wood columns, wood beams, wood trusses, and wood structural sheathing), a platform, millwork, and finishes. All new work is required to be accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/3/20128/6/20128/6/2012APASS
DetailsMike Jordan
Garrett Phone #: ###-####. ok for perm occ. map has been posted, emergency lighting at main enterance repaired.
FIRE-Final Inspection8/3/20128/3/20128/3/2012PPASS
DetailsTroy Cobbley
Life safety passed. The exit sign/emergency light at the main entrance was non-functional but is to be repaired and shown to function to the building inspector.
FIRE-Final Inspection8/1/20128/3/20128/3/2012AFAIL
DetailsTroy Cobbley
Provide completion of the project related fire alarm permit and provide the three missing exit discharge lights.
BLD-Final8/1/20128/3/20128/3/2012PCANC
DetailsMike Jordan
Garrett Phone #: ###-####
BLD-Other7/2/20127/3/20127/3/2012APASS
DetailsDave Hannah
above grid for cover//Garrett Phone #: ###-####
BLD-Framing/Rough-in6/5/20126/6/20126/6/2012APASS
DetailsMike Jordan
garrett Phone #: ###-####. Canopy framing ok. Also recieved RFI for new header deatil at new opening. All work done per approved plans and RFI.
BLD-Framing/Rough-in5/17/20125/18/20125/18/2012APART
DetailsMike Jordan
Garrett Phone #: ###-####. Ok to sheet rock interior steel stud walls and hardlid areas only. RFI required for new header from design professional, not installed per approved plans. Also spoke to contractor regarding stage ramp and new door from audio room.
BLD-Framing/Rough-in4/30/20124/30/20124/30/2012PNR
DetailsMike Jordan
Garrett Phone #: ###-####
BLD-Footing4/30/20124/30/20124/30/2012PPASS
DetailsMike Jordan
canopy footing -- Garrett Phone #: ###-####