Permit Information
Permit NumberBLD12-00321
StatusFinaled
Name STEED CONSTRUCTION
Site Address 12352 W FAIRVIEW AVE
Project NamePeterson Chevy of Boise
Customer Number 
ePlanReviewYes
Description
Peterson Chevrolet-Buick-Cadillac of Boise - To construct a new 61,595 sq. ft., two story automobile dealership building and related site improvements. The building is constructed of masonry exterior walls and steel framed construction. The new building contains a repair garage, service write-up areas, parts sales and storage, automobile showroom, related administrative office areas, as well as, exterior roof covered automobile display areas. This building is fully fire sprinkled. The sprinklers are used for area increase. The building was reviewed as nonseparated areas with the S-1 Occupancy being limited occupancy. 01/25/2013 Plan was modified to add a 2,995 sq. ft. second floor, light storage, storage area at Parts Room #127. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/18/20134/18/20134/18/2013PPASS
DetailsJim Sly
Odie Phone #: ###-####
OK for Perm Occ.
BLD-Final4/17/20134/18/20134/17/2013APART
DetailsJim Sly
odie Phone #: ###-####
OK for Temp Occ. OK to Perm ....When Zoning Perms.
BLD-Final4/15/20134/15/20134/15/2013PNR
DetailsJim Sly
odie Phone #: ###-####
Need Mech.......letter of approval fro MTI with Architect stamp and date.
FIRE-Final Inspection4/12/20134/15/20134/15/2013APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection4/8/20134/9/20134/9/2013AFAIL
DetailsTroy Cobbley
Provide fire dept. plan review comments, provide additional fire extinguisher at the car wash and on the mezzanine, provide exit discharge light at the main showroom exit (the one installed is too far away), remove exit sign at the east showroom exit per the approved plans, provide emergency lighting in the showroom entry vestible, repair non-functioning emergency lights and exit signs, provide final inspections for the fire sprinkler permits.
BLD-Ceiling Grid Inspection3/25/20133/26/20133/26/2013APASS
DetailsJim Sly
Odie phone
BLD-Ceiling Grid Inspection3/25/20133/25/20133/25/2013PCANC
DetailsJim Sly
odie Phone #: ###-####
Re-sched........
BLD-Ceiling Grid Inspection3/15/20133/15/20133/15/2013PPART
DetailsMike Jordan
odie Phone #: ###-#### Ceiling grid from grids 4 to 7 and grids c.5 to D. Needs to provide wires to diffussers. ok for tile. Will verify on next inspection.
BLD-Framing/Rough-in1/23/20131/23/20131/23/2013PPART
DetailsJim Sly
Odie ###-####
Canopy soffit framing......West and South sides of Bldg.........OK
BLD-Framing/Rough-in1/17/20131/18/20131/23/2013PCANC
DetailsJim Sly
odie Phone #: ###-####
BLD-Framing/Rough-in1/3/20131/3/20131/3/2013PPART
DetailsJim Sly
ODIE Phone #: ###-####
Upper framing above canopy and select walls OK. Need all trade rough-in inspections approved ...then call for framing insp.
BLD-Conference8/17/20128/20/20128/21/2012ADONE
DetailsJim Sly
Odie ###-####
BLD-Conference8/17/20128/17/20128/17/2012PCANC
DetailsJim Sly
Phone #: ###-####
Odie not on site.....Re-sched to Mon.
BLD-Concrete8/15/20128/16/20128/16/2012ADONE
DetailsJim Sly
Rebar - Odie Phone #: ###-####
Pad OK pending MTI special inspection, tests and approvals.
BLD-Other7/11/20127/11/20127/11/2012PPASS
DetailsTom Arcoraci
gary Phone #: ###-#### mti on site
BLD-Concrete6/25/20126/26/20126/27/2012APEND
DetailsTony Young
Stem wall - gary Phone #: ###-####,, pending special inspection
BLD-Foundation6/21/20126/22/20126/22/2012PPEND
DetailsTony Young
GARY Phone #: ###-####,, pending special inspection report
BLD-Other6/18/20126/19/20126/20/2012PPART
DetailsJim Sly
Stem wall//rebar -- Gary Phone #: ###-####
E. and W. walls OK pend MTI insp.
BLD-Foundation6/13/20126/14/20126/14/2012APART
DetailsJim Sly
Gary Phone #: ###-####
N. and W. walls.....
BLD-Footing6/8/20126/11/20126/11/2012PPART
DetailsJim Sly
Gary Phone #: ###-####
S. and E. wall footings OK pend MTI special insp, tests and approvals.
BLD-Footing6/4/20126/5/20126/5/2012APART
DetailsJim Sly
Gary Phone #: ###-####
Footing ....North and partial West wall....OK pending MTI special inspections, tests and approvals.
BLD-Footing6/1/20126/4/20126/4/2012ANR
DetailsJim Sly
Gary Phone #: ###-####
Met Gary (superint)......MTI doing special inspections. Need verification of certification for all Special inspector on site for thier specialty. Need verification that MTI is not hired by contractor. MTI to provide final letter of approval at end of job......to be archived with plans.