BLD-Final | 4/18/2013 | 4/18/2013 | 4/18/2013 | P | PASS |
Jim Sly
|
|
|
Odie Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/17/2013 | 4/18/2013 | 4/17/2013 | A | PART |
Jim Sly
|
|
|
odie Phone #: ###-#### OK for Temp Occ. OK to Perm ....When Zoning Perms.
|
BLD-Final | 4/15/2013 | 4/15/2013 | 4/15/2013 | P | NR |
Jim Sly
|
|
|
odie Phone #: ###-#### Need Mech.......letter of approval fro MTI with Architect stamp and date.
|
FIRE-Final Inspection | 4/12/2013 | 4/15/2013 | 4/15/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 4/8/2013 | 4/9/2013 | 4/9/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire dept. plan review comments, provide additional fire extinguisher at the car wash and on the mezzanine, provide exit discharge light at the main showroom exit (the one installed is too far away), remove exit sign at the east showroom exit per the approved plans, provide emergency lighting in the showroom entry vestible, repair non-functioning emergency lights and exit signs, provide final inspections for the fire sprinkler permits.
|
BLD-Ceiling Grid Inspection | 3/25/2013 | 3/26/2013 | 3/26/2013 | A | PASS |
Jim Sly
|
|
|
Odie phone
|
BLD-Ceiling Grid Inspection | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | CANC |
Jim Sly
|
|
|
odie Phone #: ###-#### Re-sched........
|
BLD-Ceiling Grid Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 | P | PART |
Mike Jordan
|
|
|
odie Phone #: ###-#### Ceiling grid from grids 4 to 7 and grids c.5 to D. Needs to provide wires to diffussers. ok for tile. Will verify on next inspection.
|
BLD-Framing/Rough-in | 1/23/2013 | 1/23/2013 | 1/23/2013 | P | PART |
Jim Sly
|
|
|
Odie ###-#### Canopy soffit framing......West and South sides of Bldg.........OK
|
BLD-Framing/Rough-in | 1/17/2013 | 1/18/2013 | 1/23/2013 | P | CANC |
Jim Sly
|
|
|
odie Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2013 | 1/3/2013 | 1/3/2013 | P | PART |
Jim Sly
|
|
|
ODIE Phone #: ###-#### Upper framing above canopy and select walls OK. Need all trade rough-in inspections approved ...then call for framing insp.
|
BLD-Conference | 8/17/2012 | 8/20/2012 | 8/21/2012 | A | DONE |
Jim Sly
|
|
|
Odie ###-####
|
BLD-Conference | 8/17/2012 | 8/17/2012 | 8/17/2012 | P | CANC |
Jim Sly
|
|
|
Phone #: ###-#### Odie not on site.....Re-sched to Mon.
|
BLD-Concrete | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | DONE |
Jim Sly
|
|
|
Rebar - Odie Phone #: ###-#### Pad OK pending MTI special inspection, tests and approvals.
|
BLD-Other | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
gary Phone #: ###-#### mti on site
|
BLD-Concrete | 6/25/2012 | 6/26/2012 | 6/27/2012 | A | PEND |
Tony Young
|
|
|
Stem wall - gary Phone #: ###-####,, pending special inspection
|
BLD-Foundation | 6/21/2012 | 6/22/2012 | 6/22/2012 | P | PEND |
Tony Young
|
|
|
GARY Phone #: ###-####,, pending special inspection report
|
BLD-Other | 6/18/2012 | 6/19/2012 | 6/20/2012 | P | PART |
Jim Sly
|
|
|
Stem wall//rebar -- Gary Phone #: ###-#### E. and W. walls OK pend MTI insp.
|
BLD-Foundation | 6/13/2012 | 6/14/2012 | 6/14/2012 | A | PART |
Jim Sly
|
|
|
Gary Phone #: ###-#### N. and W. walls.....
|
BLD-Footing | 6/8/2012 | 6/11/2012 | 6/11/2012 | P | PART |
Jim Sly
|
|
|
Gary Phone #: ###-#### S. and E. wall footings OK pend MTI special insp, tests and approvals.
|
BLD-Footing | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PART |
Jim Sly
|
|
|
Gary Phone #: ###-#### Footing ....North and partial West wall....OK pending MTI special inspections, tests and approvals.
|
BLD-Footing | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | NR |
Jim Sly
|
|
|
Gary Phone #: ###-#### Met Gary (superint)......MTI doing special inspections. Need verification of certification for all Special inspector on site for thier specialty. Need verification that MTI is not hired by contractor. MTI to provide final letter of approval at end of job......to be archived with plans.
|