Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-00336
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 6001 W CASSIA ST
Project NameBorah High School Main Bldg
Customer Number 
ePlanReviewYes
Description
(BORAH HIGH SCHOOL - SEISMIC ENHANCEMENT - CLASSROOM WINGS A, B, AND C) To add full depth vertical truss blocks at 12 feet on center maximum spacing around the perimeter of the roofs of Classroom Wings A, B, and C to connect the existing overbuilt trusses installed in 1998 to the exterior bearing walls of the original building constructed in the 1950s. The truss blocks will have a 2x4 frame with a structural panel nailed to the frame. The structural panels will be about 2 feet wide by about 4 feet tall. The truss blocks are shear panels intended to tie the existing overbuild trusses to the original structure at the exterior of the building, thereby, improving the ability of the building to respond appropriately to seismic loads. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The attic has a fire sprinkler system. The fire sprinkler system is required to be maintained in compliance with NFPA 13 as regulated by the Fire Department. The windows for all 3 classroom wings will be replaced under permit BLD12-00612. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/31/20132/1/20132/1/2013PPASS
DetailsTom Arcoraci
DOC - Permit Finaled2/1/20132/1/20132/1/2013PPASS
DetailsTom Arcoraci
FIRE-Final Inspection1/31/20132/1/20132/1/2013PPASS
DetailsForrest France
Site inspection passed.
BLD-Framing/Rough-in1/30/20131/31/20131/31/2013PPASS
DetailsTom Arcoraci
Access to attic areas must be after 3:30 PM, Per Boise School Dist. Please call John Hanson at # listed above, Thank-You. Phone #: ###-#### >> Inspection requested via web by John Hanson