Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD12-00345
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 12601 W BRIDGER ST
Project NameIDAHO POWER PHASE 1
Customer Number 
ePlanReviewNo
Description
PLAN MODIFCATION MINOR IN SCOPE TO BE ADDED TO THIS PERMIT SCOPE. LABLED AS PHASE THREE 3/4F/G SM STORAGE RM TWO DOOR AND 24 FT OF HARD WALL. AREA B WIRING CLOSET AND STORAGE EXISTING. AREA C USE OF EXISTING SERVER RM. SEPT. ELE AND FIRE PERMITS REQUIRED.IDAHO POWER PHASE 1 FPP permit previously MCI building built and finaled in 1994. Renovation of aprox. 6000 sq ft to create a data floor complet with mechnical and electrical system upgrades and support space for IT distubution. Structure is fully engineered and designed for onehour const. that is not code driven but shall be const. perplan. Fire alarm and sprinkler submitals are required to be submited to the boise city fire planreview for aprovals. Inspections are to be direct contact with the inspectors. Bld Jim Storey 794-9490/ Mech Troy James 794-9461/ Plm Jim Jhonson 794-9476/ Ele Daryl Degrange 794-1379/ Fire Forest France 794-1981
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/2/20128/3/20128/3/2012APASS
DetailsTroy Cobbley
life safety passed
BLD-Final7/30/20127/31/20128/3/2012ADEFR
DetailsJim Storey
BLD-Final8/3/20128/3/20128/3/2012APASS
DetailsJim Storey
final ok
FIRE-Final Inspection7/30/20127/31/20127/31/2012AFAIL
DetailsTroy Cobbley
Repair emergency lights.
BLD-Final7/30/20127/30/20127/30/2012ADEFR
DetailsJim Storey
BLD-Final7/25/20127/25/20127/30/2012PNR
DetailsJim Storey
BLD-Conference7/5/20127/5/20127/5/2012ADONE
DetailsTroy Cobbley
Jim and I met with the general contractor to discuss outstanding issues for sign offs on pnhase 1,2, and 3. Jim is going to take care of the door hardware requirements.
BLD-Conference7/5/20127/5/20127/5/2012APASS
DetailsJim Storey
need to provide hardware listing for exit door instaled under previous permit.
FIRE-Final Inspection6/28/20126/28/20126/28/2012PFAIL
DetailsTroy Cobbley
The issues with the project related fire alarm permit, for phase I, needs to be addressed. Egress issues may be present for the exterior doors that currently utilize door magnets. Tom (building superintendant), Jim Storey and I are going to meet and discuss the issue and possible solutions.
BLD-Final6/26/20126/27/20126/27/2012APART
DetailsJim Storey
pending fire/ wip for ramp and handrailing/ ok to instal equment.
FIRE-Conference6/22/20126/22/20126/22/2012PDONE
DetailsTroy Cobbley
The project super intendant and I went over fire extinguishers and exit signs.
BLD-Framing/Rough-in5/23/20125/23/20125/23/2012PPASS
DetailsJim Storey
wall framing at old dock area ok to cover// scope of work is added to orig. permit of server space. up dated ele permit will be forth coming to this bld.
BLD-Conference5/3/20125/3/20125/3/2012APASS
DetailsJim Storey
framing ok/ reviewed progress ok.
BLD-Framing/Rough-in4/10/20124/10/20124/10/2012PPASS
DetailsJim Storey
Justin Phone #: ###-####
BLD-Wall cover4/6/20124/6/20124/6/2012APART
DetailsJim Storey
gyp screwing ok at n and s interior sde walls.
BLD-Other4/5/20124/6/20124/6/2012ACANC
DetailsJim Storey
fpp roof // perimtor screwing not complet// gyp screwing ok at n and s interior sde walls.
BLD-Framing/Rough-in4/4/20124/5/20124/5/2012APASS
DetailsJim Storey
FPP wall framing ok
BLD-Framing/Rough-in4/3/20124/4/20124/4/2012AFAIL
DetailsJim Storey
FPP am appointment need header screw sch at king studs// rafter clip complet king stud screw penatration.
BLD-Conference3/27/20123/28/20123/28/2012APASS
DetailsJim Storey
am appointment// reviewed 1 hr const requirments.
BLD-Conference3/21/20123/21/20123/21/2012PPART
DetailsJim Storey
wip
BLD-Footing3/6/20123/6/20123/6/2012PPASS
DetailsJim Storey
ft ok/ rebar ok per plan. recieved si scope and meet in the field.