BLD-Final | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | PASS |
Mike Jordan
|
|
|
ADAM Phone #: ###-####
|
DOC - Permit Finaled | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Mike Jordan
|
|
|
All issues resolved.
|
BLD-Final | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Egress window in upstairs bedroom must comply with Sec R612.2. Clear opening of window is less than 24 inches from finished floor and greater than 72 inches from finished grade. Due to being an egresss window, must comply with Sec R612.4.2 for compliance on egress opening limiting devices. Correction notice was posted.
|
BLD-Energy code compliance | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 6/12/2012 | 6/13/2012 | 6/13/2012 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 6/7/2012 | 6/8/2012 | 6/8/2012 | A | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####Provide attic access Aove master bedroom and living room, Complete lateral bracing on A2A atiic trusses, ACAP piggy back trusses require full bearing on bottom chord, repair bolts at garage portal frame. Correction notice posted, ok to insulate.
|
BLD-Wall Bracing | 5/29/2012 | 5/30/2012 | 5/30/2012 | P | PART |
Mike Jordan
|
|
|
ADAM Phone #: ###-####. Exterior shear nail ok. ok to cover.
|
BLD-Wall Bracing | 5/24/2012 | 5/29/2012 | 5/29/2012 | P | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####. nailing not as per plan, provide portal frame at livingroom window, provide the 800 lb. floor to floor hold down strap and the additional 800lb. hold down strap at bathroom window behind the garage. Install the 1000lb straps for portal frame at garage.
|
BLD-Foundation | 5/9/2012 | 5/11/2012 | 5/11/2012 | A | PART |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 5/9/2012 | 5/10/2012 | 5/10/2012 | A | PASS |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|