Permit Information
Permit NumberBLD12-00364
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 8055 W GODDARD RD
Project NameCAPITAL HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL - stair addition) Areas within this permit scope of work will be sprinklered. To perform select demolition of two existing open exterior stairs and egress paths and courtyard areas in preparation for construction of a new enclosed access / egress corridor with additional storage area and new access / egress routes from existing exit doors from existing school classroom areas providing access to a new enclosed stairway opening into the existing courtyard at grade. Work includes modification to existing canopy; repair of exterior stairs and courtyard walkways; new canopy cover over the repaired walkway; a new accessible ramp access route, handrails, guards and door hardware; structural upgrades to provide support for new work and to add needed lateral support in portion of existing east wall of auditorium; install new and or relocated glazing systems; electrical, mechanical, plumbing, fire sprinkler and alarm work for the areas within the scope of this permit. Reviewed plan approval includes compliance with all red lines on plans an all attached plan review comments and conditions attached to plans by all plan reviewing agencies. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201212/5/201212/5/2012APASS
DetailsJim Sly
Please call prior for access - Matt Phone #: ###-####
Certificate of Compliance issued.
DOC - Permit Finaled12/5/201212/5/201212/5/2012PPASS
DetailsJim Sly
BLD-Final11/30/201211/30/201211/30/2012PNR
DetailsMike Jordan
call if questions//Matt Phone #: ###-####. Provide the final inspection letter from special inspection agency.
FIRE-Conference11/26/201211/26/201211/26/2012PDONE
DetailsTroy Cobbley
The life safety will be ok to final when the project related fire alarm permit is complete.
BLD-Ceiling Grid Inspection11/2/201211/2/201211/2/2012PPASS
DetailsJim Sly
Jack Phone #: ###-####
BLD-Other10/3/201210/3/201210/3/2012PPASS
DetailsJim Sly
ceiling grid//Jack House Phone #: ###-####
BLD-Framing/Rough-in9/26/20129/26/20129/26/2012PPASS
DetailsJim Sly
jack Phone #: ###-####
BLD-Concrete8/8/20128/9/20128/9/2012APART
DetailsJim Sly
jack Phone #: ###-####
Roof beams/parapet.........OK pending MTI inspection, tests and approvals.
BLD-Concrete7/25/20127/25/20127/25/2012PPART
DetailsJim Sly
collumn concrete insp--Jack House Phone #: ###-####
OK pend MTI inspection,tests and approvals.
BLD-Other7/19/20127/20/20127/20/2012APART
DetailsJim Sly
jack late am if possible Phone #: ###-####
Columns OK pending MTI special insp, tests and approvals.
BLD-Concrete7/11/20127/12/20127/12/2012ADEFR
DetailsMike Jordan
Jack Phone #: ###-####. Will have special inspection.
BLD-Other7/3/20127/3/20127/3/2012PPASS
DetailsJim Sly
Stem wall prior to 2 if possible -- Jack Phone #: ###-####
OK pending MTI special insp, tests and approvals.
BLD-Framing/Rough-in6/27/20126/28/20126/28/2012APART
DetailsJim Sly
Jack Phone #: ###-####
Should be footing inspection.......MTI employed by the school district..... MTI employees Cert. OK'd Charles Kaiser and Troy Cunningham. Footing OK Pending MTI special insp, tests and approvals.