Permit Information
Permit NumberBLD12-00377
StatusFinaled
Name Carol Vorhis
Site Address 100 S 6TH ST
Project NameCHINA BLUE
Customer Number 
ePlanReviewYes
Description
(CHINA BLUE - 2ND STORY SMOKING DECK) The fire sprinkler system is used for fire area and for story increase. To construct a 410 square foot smoking deck above the roof of an existing building. The deck will not be covered. This building has a 2 story portion and a 1 story portion. The deck will be constructed above the 1 story portion and will be elevated about 35 inches above the floor surface of the existing 2nd story. Access to the deck will be from the existing 2nd story. Work is to include LVL wood beams, wood joists, “Trexdeck” decking, guards, handrails, etc. Special Inspection is required for epoxy anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/23/2015 DONE
BLD-Final10/31/201211/1/201211/2/2012PPASS
DetailsDave Hannah
Darren Phone #: ###-####
FIRE-Final Inspection10/31/201211/1/201211/1/2012APASS
DetailsForrest France
C/N items verified for completion. Contractor to provide EM lighting at the exterior deck prior to structural final.
FIRE-Conference10/1/201210/1/201210/1/2012ADONE
DetailsForrest France
Regarding fire alarm permit work.
FIRE-Final Inspection9/26/20129/27/20129/27/2012AFAIL
DetailsForrest France
Non-functional exit signs and EM lights within path of egress, PFE needs tagged and mounted, provide approved door hardware at the deck exit, missing emergency lighting at the deck, fire alarm notification to be extended per plans delta 2 and fire code review comments dated 6/13/12.
BLD-Final9/20/20129/21/20129/21/2012PFAIL
DetailsDave Hannah
request first insp//Darren Phone #: ###-#### needs hand rail and ext gaurd rail hight
BLD-Other8/31/20129/4/20129/4/2012APASS
DetailsDave Hannah
CMU inspection please-Darren Phone #: ###-####