BLD-Final | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/9/2012 | 10/10/2012 | 10/10/2012 | A | PASS |
Jim Storey
|
|
|
JC Phone #: ###-#### ok to cover gyp on entry .
|
FIRE-Final Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed per inspector 410
|
BLD-Framing/Rough-in | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | PASS |
Jim Storey
|
|
|
1 hr sheet rock inspection please-JC Phone #: ###-#### ok to cover with gyp
|
BLD-Footing | 9/6/2012 | 9/6/2012 | 9/6/2012 | P | PASS |
Jim Storey
|
|
|
j.c. Phone #: ###-#### ft and rebar ok for entry canopy.
|
FIRE-Conference | 8/7/2012 | 8/7/2012 | 8/27/2012 | A | DONE |
Forrest France
|
|
|
|
BLD-Other | 8/14/2012 | 8/14/2012 | 8/14/2012 | P | PASS |
Jim Storey
|
|
|
jc - ceiling Phone #: ###-####
|
BLD-Final | 8/9/2012 | 8/10/2012 | 8/10/2012 | P | PART |
Tom Arcoraci
|
|
|
JC - westside Phone #: ###-#### ok to follow fire inspector instructions
|
FIRE-Final Inspection | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | PART |
Forrest France
|
|
|
Fire life safety at the west side offices 1st and 2nd floor only approved pending conditions are met and maintained as discussed. Elevator is not to be used until recall service features are installed.
|
BLD-Other | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Jim Storey
|
|
|
JC - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | PASS |
Jim Storey
|
|
|
jc Phone #: ###-#### east stair encloser reframed ok pending trades aprovals.
|
BLD-Framing/Rough-in | 6/13/2012 | 6/14/2012 | 6/14/2012 | A | PART |
Jim Storey
|
|
|
jc Phone #: ###-#### ceilling and walls west end ok to gyp
|
BLD-Framing/Rough-in | 6/6/2012 | 6/7/2012 | 6/7/2012 | A | PART |
Jim Storey
|
|
|
JC Phone #: ###-####
|