BLD-Final | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PART |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-#### needs landscape
|
FIRE-Final Inspection | 11/2/2012 | 11/5/2012 | 11/5/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Other | 10/11/2012 | 10/11/2012 | 10/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ceiling grid - Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2012 | 8/29/2012 | 8/29/2012 | P | PASS |
Tom Arcoraci
|
|
|
RYAN Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2012 | 8/14/2012 | 8/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-#### wip ok
|
BLD-Wall Bracing | 8/6/2012 | 8/6/2012 | 8/6/2012 | P | PASS |
Tom Arcoraci
|
|
|
Shear wall -- Brian Phone #: ###-####
|
BLD-Wall cover | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/27/2012 | 7/30/2012 | 7/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
Fire Wall- Ryan Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Sly
|
|
|
ryan Phone #: ###-#### Foundation insulation OK.
|
BLD-Concrete | 6/27/2012 | 6/28/2012 | 6/28/2012 | A | PASS |
Jim Sly
|
|
|
ryan Phone #: ###-#### Foundation walls OK pending MTI special insp, tests and approvals.......MTI employed by Boise School Dist.
|
BLD-Concrete | 6/21/2012 | 6/22/2012 | 6/21/2012 | A | PART |
Jim Sly
|
|
|
Ryan Phone #: ###-#### No approved plans on site. Contractor to verify that MTI was not hired by Contractor. Need credentials from all special inspectors employed by MTI. Un-approved set of plans calls for special insp...Concrete, reinforcement, epoxy. Cannot find design strength of concrete. Unable to contact Engineer of record to verify this. MTI to be on site for inspections. Plans were examined electronically. Architect to provide. I observed 2-#5s in footing Horiz. and 2-#4's Vert at 18"oc. Can pour only if approved plans on site and MTI approval. Advised Ryan.
|