Permit Information
Permit NumberBLD12-00532
StatusFinaled
Name WESTERN IDAHO BUILDERS
Site Address 2405 S VISTA AVE
Project NameJackson Store #123
Customer Number 
ePlanReviewNo
Description
(JACKSONS STORE #123 - REMODEL AND BACKROOM ADDITION) (DRH12-00034) To construct a 311 square foot addition to an existing convenience store. The front canopy will be cut back by about 382 square feet. After the addition, this building will have a total floor are of about 2,874 square feet (308 square feet remaining canopy, 311 square feet addition, and 2,255 square feet existing interior area). Work is to include interior nonbearing walls, new walk-in coolers, a walk-in freezer, a suspended acoustical ceiling, a new roof covering with R-20 minimum continuous insulation, and a new restroom accessible to the disabled. The new restroom replaces an existing non-accessible restroom. Existing high masonry walls that extend above the roof and were formerly used for sign panels will be demolished. Work related to the building addition includes concrete footings, masonry foundations, a concrete slab on grade, masonry walls with a parapet at the property line, wood ledgers, wood roof joists, wood roof deck, and a single ply roof membrane with R-20 minimum continuous insulation. The insulation will be shaped to insure a 2% slope for roof drainage. Special inspection is required for epoxy anchors and masonry. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20125/23/20125/23/2012APASS
DetailsTom Arcoraci
kenny Phone #: ###-#### pending zoning sign off ok
FIRE-Final Inspection5/18/20125/22/20125/22/2012APASS
DetailsForrest France
Fire life safety approved pending doors and hardware at the back room and restroom are installed prior to structural final as discussed. Remainder of inspection items passed.
FIRE-Final Inspection5/21/20125/21/20125/21/2012ANR
DetailsForrest France
Final scheduled 5/22 AM.
BLD-Framing/Rough-in5/18/20125/18/20125/18/2012PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/17/20125/18/20125/18/2012APASS
DetailsTom Arcoraci
kenny Phone #: ###-####
FIRE-Conference5/7/20125/7/20125/8/2012ADONE
DetailsForrest France
Site work in progress.
BLD-Framing/Rough-in5/2/20125/3/20125/3/2012APART
DetailsTom Arcoraci
Kenny Phone #: ###-#### ok pending appeal
BLD-Framing/Rough-in5/1/20125/1/20125/1/2012PPART
DetailsTom Arcoraci
BLD-Other4/27/20124/30/20124/30/2012APASS
DetailsTom Arcoraci
Chuck pour at 11 Phone #: ###-#### mti spec insp
BLD-Footing4/19/20124/20/20124/20/2012APASS
DetailsTom Arcoraci
request 11am//Chuck Phone #: ###-####