BLD-Final | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####Ok for temp occ. at this time. Will be ok for perm occ. once zoning signs eprm.
|
FIRE-Final Inspection | 2/27/2013 | 2/28/2013 | 2/28/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Per letter from engineer the duct smoke detector is not required by them. Dead bolt is going to be blanked off.
|
FIRE-Final Inspection | 2/27/2013 | 2/27/2013 | 2/27/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide verification from the mechanical engineer for the deletion of the duct smoke detector and provide verification from the building plan reviewer for permission to install double keyed lock on the weight room door. If installed an "indicator" and sticker will also be required.
|
BLD-Energy code compliance | 11/9/2012 | 11/13/2012 | 11/13/2012 | P | PASS |
Jim Sly
|
|
|
Kelly phone OK to cover all but........Mechanical room and restrooms associated with pool area.
|
BLD-Energy code compliance | 11/9/2012 | 11/9/2012 | 11/9/2012 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman Had a few corrections to complete before approval.
|
BLD-Framing/Rough-in | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman dg3 need lgt2 simpson at bearing point #1/ fire blk ceilling at unusable space/ provide ada backing in restarooms.
|
BLD-Framing/Rough-in | 11/6/2012 | 11/6/2012 | 11/6/2012 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman Need all Rough-ins approved.
|
BLD-Wall Bracing | 9/18/2012 | 9/18/2012 | 9/18/2012 | P | PART |
Mike Jordan
|
|
|
kelly Phone #: ###-####. Exterior shear nailing and holdowns. Missing HD3B holddown at NW corner, Add additional blocking and nailing at vertical edges on shear panel 5. Correction notice was posted. Also needs to tighten bolts on holddowns.
|
BLD-Foundation | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | PASS |
Mike Jordan
|
|
|
dane Phone #: ###-####. Perimeter footings ok.
|
BLD-Footing | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PART |
Mike Jordan
|
|
|
dane Phone #: ###-####. Perimeter footings and column pad footings. Work inprogress on placing vertical steel.
|