BLD-Final | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Will be ok for perm occ. once zoning signs perms.
|
FIRE-Final Inspection | 2/27/2013 | 2/28/2013 | 2/28/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | PART |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. OK for eprm occ.
|
BLD-Final | 1/23/2013 | 1/23/2013 | 1/23/2013 | P | PEND |
Jim Sly
|
|
|
We are requesting a Final Inspection "Consultation" for our first building Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
Explained requirements to obtain Certificate of Occupancy.
|
BLD-Other | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | PASS |
Mike Jordan
|
|
|
base layer, 1hr. corridor lids ok.
|
BLD-Other | 10/24/2012 | 10/24/2012 | 10/24/2012 | P | NR |
Mike Jordan
|
|
|
|
BLD-Other | 10/24/2012 | 10/24/2012 | 10/24/2012 | A | NR |
Mike Jordan
|
|
|
|
BLD-Other | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Mike Jordan
|
|
|
1st. floor party walls and horizontal assemblies ok. Base layer 2nd floor corridor ceiling ok, face layer 1st floor corridor ceiling ok.
|
BLD-Other | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | PART |
Mike Jordan
|
|
|
1st floor party walls and face layers of 5/8 type x rock, corridor base layers of 5/8 type x rock at floor ceiling assemblies.
|
BLD-Other | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PART |
Mike Jordan
|
|
|
Face layer 5/8 type x rock at horizontal assembly. 1st. floor.
|
BLD-Conference | 10/22/2012 | 10/22/2012 | 10/22/2012 | A | PART |
Mike Jordan
|
|
|
BAse layer for horizontal assembly, 1st. foor.
|
BLD-Other | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PASS |
Mike Jordan
|
|
|
2nd floor horizontal assemblies and fire partions in dwelling units ok for cover.
|
BLD-Other | 10/19/2012 | 10/19/2012 | 10/19/2012 | A | PART |
Mike Jordan
|
|
|
BAse and face layers for horizontal assembly, 2nd. floor.
|
BLD-Other | 10/18/2012 | 10/18/2012 | 10/19/2012 | P | PART |
Mike Jordan
|
|
|
2nd floor horizontal assembly, base layers.
|
BLD-Other | 10/17/2012 | 10/18/2012 | 10/18/2012 | A | PASS |
Mike Jordan
|
|
|
2nd. floor 1hr. horizontal assembly, base layer of 5/8 type x rock ok.
|
BLD-Conference | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | DONE |
Mike Jordan
|
|
|
Went over horizontal assembly detail with sheet rock foreman.
|
BLD-Energy code compliance | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 10/12/2012 | 10/12/2012 | 10/12/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PART |
Tom Arcoraci
|
|
|
Need to have Jim come out for a framing re inspection Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Framing/Rough-in | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman dicussed fire stopping
|
BLD-Wall Bracing | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Mike Jordan
|
|
|
kelly Phone #: ###-####. Exterior shear wall and all required straps installed. ok to cover.
|
BLD-Conference | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | DONE |
Mike Jordan
|
|
|
Spoke to framing subcontractor abput truss blocking.
|
BLD-Conference | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | DONE |
Mike Jordan
|
|
|
Meeting with subcotractors. Met with subcontractors on site to discuss all rated penetrations and what will be required.
|
BLD-Conference | 7/26/2012 | 7/26/2012 | 7/27/2012 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 7/24/2012 | 7/24/2012 | 7/24/2012 | A | DONE |
Mike Jordan
|
|
|
Reviewed plans, framing, and firerated construction details with framer and general contractor.
|