BLD-Final | 6/29/2012 | 7/2/2012 | 7/3/2012 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Final | 7/3/2012 | 7/3/2012 | 7/3/2012 | P | PASS |
Dave Hannah
|
|
|
Steve Ove Phone #: ###-####
|
FIRE-Final Inspection | 6/29/2012 | 7/2/2012 | 7/2/2012 | A | PASS |
Forrest France
|
|
|
Noted conditions for final occupancy field verified for completion. Life safety final approved.
|
FIRE-Final Inspection | 6/14/2012 | 6/14/2012 | 6/14/2012 | A | NR |
Forrest France
|
|
|
|
FIRE-Final Inspection | 6/6/2012 | 6/6/2012 | 6/6/2012 | A | PART |
Forrest France
|
|
|
TCO approved. Final pending repairs.
|
BLD-Final | 6/4/2012 | 6/5/2012 | 6/5/2012 | P | PART |
Dave Hannah
|
|
|
Jeff Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PART |
Forrest France
|
|
|
Temporary occupancy approved per contractor agreement with J. Blais and R. Gervais. Final pending corrections underway in the warehouse area. Remainder of C/N items are finished.
|
FIRE-Conference | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | DONE |
Forrest France
|
|
|
Regarding C/N items, project schedule.
|
BLD-Final | 5/31/2012 | 6/1/2012 | 6/4/2012 | P | NR |
Dave Hannah
|
|
|
Building Final - Please call Steve Ove ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis needs a fire final first
|
FIRE-Final Inspection | 5/31/2012 | 6/1/2012 | 6/1/2012 | P | FAIL |
Forrest France
|
|
|
C/N items include; post building address, provide current certification for the PFE at the east side, provide thermal barrier at the exposed paper faced insulation in the warehouse area, remove hasp at the SW exit door, reverse door swing at E4 or provide documentation for alternate approval.
|
BLD-Framing/Rough-in | 5/17/2012 | 5/18/2012 | 5/18/2012 | A | PASS |
Dave Hannah
|
|
|
Please call Steve Ove when heading to site ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis
|