Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-00851
StatusFinaled
Name PLATINUM PROS LLC
Site Address 350 N MILWAUKEE ST Unit: 1051
Project NameBTS - #1051 Nakedology
Customer Number 
ePlanReviewNo
Description
(NAKEDOLOGY – BTS SPACE # 1051) Permit is to combine two existing tenant suites (ste# 1051 and 1053) to create a 4,242 square foot retail / business tenant space. This space was previously occupied by “BacQuets” as part of space # 1053 under BLD08-00782. Scope of work includes: new unisex restroom, new accessible counter, [new partition walls to create a tanning rooms, spa rooms, a mechanical room, and work rooms], new lighting, new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/31/20129/4/20129/4/2012PPASS
DetailsMike Jordan
Anna Phone #: ###-####
FIRE-Final Inspection8/31/20129/4/20129/4/2012APASS
DetailsForrest France
Correction items are finished. Fire life safety final approved.
BLD-Final8/30/20128/31/20128/31/2012PNR
DetailsJim Sly
call first//Anna Duletsky Phone #: ###-####
Need fire final........
FIRE-Final Inspection8/30/20128/31/20128/31/2012AFAIL
DetailsForrest France
Correction items include; adding missing exit sign shown per plan at the sales floor area, repair two non-functional exit signs, provide missing escutcheon, post PFE as discussed. Smoke evac test completed acceptable.
FIRE-Final Inspection8/24/20128/27/20128/27/2012AFAIL
DetailsTroy Cobbley
I left message on the contacts voice mail and also met the electrician for testing of the smoke evac system but the project was locked with no access. No inspection was performed.
BLD-Framing/Rough-in5/11/20125/14/20125/14/2012APASS
DetailsMike Jordan
Anna Phone #: ###-####
BLD-Framing/Rough-in5/10/20125/11/20125/11/2012APART
DetailsMike Jordan
anna Phone #: ###-####. Interior steel stud walls and hardlids. Needs to add the kickers as shown on plan. Pending plumbing rough in inspection.