BLD-Final | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | PASS |
Jim Sly
|
|
|
Rick Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Revise floor plan is on site.
|
FIRE-Final Inspection | 10/2/2012 | 10/3/2012 | 10/3/2012 | P | FAIL |
Troy Cobbley
|
|
|
Duct smoke detectors have been installed and tested ok. Still need the approved revised floor plan for a life safety final.
|
BLD-Final | 10/2/2012 | 10/2/2012 | 10/2/2012 | P | NR |
Tom Arcoraci
|
|
|
Rick Phone #: ###-####
|
FIRE-Final Inspection | 10/2/2012 | 10/2/2012 | 10/2/2012 | P | FAIL |
Troy Cobbley
|
|
|
Resubmit plans showing the actual wall layout. Provide hvac duct detector shutdown as per IMC 606.2.2
|
BLD-Wall cover | 9/27/2012 | 9/28/2012 | 9/28/2012 | A | PASS |
Mike Jordan
|
|
|
Early as possible - Rick Phone #: ###-####. Ceiling grid ok.
|
BLD-Conference | 9/21/2012 | 9/24/2012 | 9/24/2012 | P | DONE |
Mike Jordan
|
|
|
Rick-Around noon if possible please Phone #: ###-####. Spoke to contractor about what he needs for c.o
|
BLD-Energy code compliance | 9/6/2012 | 9/7/2012 | 9/7/2012 | P | PASS |
Mike Jordan
|
|
|
RIck Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PART |
Mike Jordan
|
|
|
rick Phone #: ###-####. Interior steel stud walls, soffits and hardlids, pending mechanical rough in inspection.
|
BLD-Other | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Tom Arcoraci
|
|
|
roof insp//Rick (please call if anything is wrong because he is in Washington) Phone #: ###-####
|
BLD-Concrete | 7/25/2012 | 7/26/2012 | 7/26/2012 | P | PART |
Mike Jordan
|
|
|
Rebar- - Rick Phone #: ###-####. Welded wore mesh for interior slab on grade. Work in progress on installing chairs.
|
BLD-Other | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | PASS |
Mike Jordan
|
|
|
masonary insp//Dennis Phone #: ###-####. 0 to 4ft. elevation for masonry wall, north, south and west walls. Also verified firestop system on west wall at control joints.
|
BLD-Foundation | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | CANC |
Mike Jordan
|
|
|
Rick Phone #: ###-####
|
BLD-Energy code compliance | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | PASS |
Mike Jordan
|
|
|
Rick Phone #: ###-####. Rigid foam insulation on interior side of foundation.
|
BLD-Foundation | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | PART |
Mike Jordan
|
|
|
rick early if possible Phone #: ###-####. stemwall for dumpster enclosure.
|
BLD-Concrete | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | PART |
Mike Jordan
|
|
|
SPouring at 4 for stem wall for foundations/footings-- Rick Phone #: ###-####
|
BLD-Foundation | 7/10/2012 | 7/11/2012 | 7/11/2012 | A | PART |
Mike Jordan
|
|
|
Around noon if possible - - Rick Phone #: ###-####. Perimeter footings, work in progress. Will have special inspections.
|
BLD-Conference | 7/6/2012 | 7/9/2012 | 7/9/2012 | A | DONE |
Mike Jordan
|
|
|
Phone #: 3606243765 >> Inspection requested via mobile web by Rick Magistrale
|