Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01027
StatusFinaled
Name EKC INC
Site Address 450 W McGREGOR DR
Project NameCAMPBELL & COMPANY
Customer Number 
ePlanReviewNo
Description
(CAMPBELL & COMPANY - 2ND STORY ADDITION) (10-19-12 PLAN MODIFICATION TO CREATE AN ADDITIONAL RESTROOM [2 TOTAL] ON THE 2ND STORY AND TO CONSTRUCT A JANITOR’S CLOSET. THE SHOWER PAN WITHIN THE JANITOR’S CLOSET IS NOT APPROVED AS A SHOWER AND SHALL NOT HAVE A SHOWER HEAD INSTALLED. ALSO, TO CREATE 3 OFFICES ON THE 2ND STORY AND TO RECONFIGURE THE 1-HR STAIRWAY ENCLOSURE ON THE 2ND STORY.) This building does not have a fire sprinkler system. To create a 6,460 square foot tenant space (3,825 square foot 1st story and 2,635 square foot 2nd story) within an existing building. The total first story floor area of this existing building is 9,726 square feet and the total 2nd story floor area will be 4,585 square feet (14,311 square feet total building area). The existing 424 square foot upper level of this new tenant space will be expanded by 2,211 square feet. A 3-hr fire barrier wall will be constructed to separate the North tenant space (5,925 square foot 1st story and 1,950 square foot 2nd story) from this South tenant space (3,825 square foot 1st story and 2,635 square foot 2nd story) so that the fire area will be less than 12,000 square feet and a fire sprinkler system will not be required. To avoid an elevator within this building, this South tenant space was considered to be independent of the North tenant space for the application of the elevator exception. No doors are allowed in the fire barrier separating the 2 tenant spaces. Structural work is to include concrete footings, steel columns, steel beams, steel floor joists, steel pan deck, concrete floor, steel stud bearing walls, and stairways with steel stringers and concrete filled stair pans. Special Inspection is required for concrete, welding, bolting, and epoxy anchors. The design for the new bar joists is a deferred submittal item. Other work includes a restroom accessible to the disabled, interior nonbearing walls, a 1-hr fire-resistance-rated stairway enclosure, and interior finishes. The structure that supports any portion of the 1-hr stairway enclosure (i.e. columns, beams, joists, bearing walls, floors) or is part of the 1-hr stairway enclosure (i.e. floors, walls) are also required to be of 1-hr fire-resistance-rated construction. Approved fire-resistance-rated assemblies shall be provided to the Structural Inspector. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy only for the tenant space located South of the 3-hr fire barrier wall. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/20/201211/21/201211/20/2012APASS
DetailsJim Storey
james Phone #: ###-####
BLD-Final11/20/201211/20/201211/20/2012PPASS
DetailsJim Storey
BLD-Final11/16/201211/19/201211/19/2012APART
DetailsJim Storey
James Phone #: ###-#### temp ok pending top of wall fire stopping./ si final sign off.
FIRE-Final Inspection11/16/201211/16/201211/16/2012PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Framing/Rough-in11/13/201211/13/201211/13/2012PPART
DetailsJim Storey
Fire wall - James Phone #: ###-#### seal head of wall at bar joist and roof purlin.
BLD-Framing/Rough-in10/12/201210/12/201210/12/2012PPASS
DetailsJim Storey
James Phone #: ###-#### mez and stairs ok
BLD-Framing/Rough-in9/13/20129/14/20129/14/2012APASS
DetailsJim Storey
structural and fire wall//James Phone #: ###-#### fire wall ok// bearing wall for mez ok
BLD-Other9/12/20129/13/20129/13/2012PNR
DetailsJim Sly
JAMES LATE AS POSSIBLE Phone #: ###-####
Met with James Wall not ready.......Holes and breaches to be addressed. Gutter? and behind purlin.........
BLD-Framing/Rough-in9/12/20129/13/20129/13/2012PPART
DetailsJim Sly
JAMES Phone #: ###-####
Told James that new steel stud wall ......Located at North wall in South room .....should be OK. as you will still be able to look at it when you go out next. They want to hang steel and joists on it.
BLD-Framing/Rough-in8/28/20128/29/20128/29/2012APART
DetailsJim Storey
Sheetrock for fire wall - James Phone #: ###-#### 3hr wall gyp progression ok // need arh to provide top of wall detail / si contract to be provided// wall and floor sys to have wall continued thru.