Permit Information
Permit NumberBLD12-01193
StatusFinaled
Name ESI
Site Address 401 S BROADWAY AVE
Project NameWhole Foods
Customer Number 
ePlanReviewYes
Description
(WHOLE FOODS - TENANT IMPROVEMENT PHASE) The fire sprinkler system is used for building area increase and for fire area. To perform interior tenant improvement work to a shell building having a 37,200 square foot 1st story (includes the area under all roof projections) and a 6,471 square foot mezzanine. The shell was constructed under permit BLD11-01695. The on grade concrete slab and the mezzanine concrete slab were placed under permit BLD12-00944. Under-slab electrical raceways and under-slab plumbing were installed in conjunction with that permit. The work is to include interior nonbearing walls, 2 public restrooms accessible to the disabled, 1 employee restroom accessible to the disabled, walk-in coolers and freezers, food preparation equipment, grease hoods and grease ducts, service counters, check-out aisles, self-service shelves and display units, exterior steel trellis structures, etc. Special inspection is required for welding , concrete, concrete reinforcement, bolts in concrete, and epoxy anchors. Some HVAC equipment will be moved from where they were shown on the shell drawings. Some equipment will weigh more than what was originally shown. The required structural analysis and potential structural upgrades for the existing roof structure are deferred submittal items. The support for the grease hoods are also deferred submittal items. Provide the requested analysis for review before items are installed. Equipment shall not be installed until the structural design is approved by the Building Official. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/7/2013 PASS
DetailsDave Hannah
All work completed under Bld12-01193
BLD-Final11/8/201211/8/201211/8/2012PPASS
DetailsDave Hannah
gaurd rail is now solid steel sheetmetal pannels if they go back to a cable rail system they will need to repermit and run though plan reveiw
FIRE-Final Inspection11/7/201211/8/201211/8/2012APASS
DetailsForrest France
Field verified C/N items. Fire life safety finaled.
BLD-Final11/8/201211/8/201211/8/2012APART
DetailsDave Hannah
ok for temp occ needs engineering and signoffs on cable gaurdrail contractor has temp secured with sheet metal
BLD-Final11/6/201211/7/201211/7/2012AFAIL
DetailsDave Hannah
Jeff Phone #: ###-#### need a final letter from spec inspection company close off gaurd rail over stairs in barr get cabel gaurd rail engineered and resubmitted and inspected with an approval letter from engineer move hand dryer in ada restroom get other trades finaled
FIRE-Final Inspection11/5/201211/6/201211/7/2012PPART
DetailsForrest France
Fire life safety inspection completed. Noted items include adjustments at directional exit signage, post two additional extinguishers, provide missing exit discharge light at the NE exit, relocate refrigerant alarm signage, provide EM lighting at the immediate vicinity of the north main exit, post max occupant load sign at the 2nd floor bar area, provide approved style hardware at two sliding cooler doors.
FIRE-Final Inspection11/7/201211/7/201211/7/2012APASS
DetailsForrest France
Correction items verified. Hardware at cooler doors to be completed as discussed. Fire life safety finaled.
FIRE-Final Inspection10/22/201210/22/201210/30/2012PPART
DetailsForrest France
Refer to project related fire alarm and sprinkler permit activity notes for work completed to date. Approval for stock granted per agreement with contractor and discussion with Cheif R. Gervais.
BLD-Conference10/22/201210/22/201210/23/2012PDONE
DetailsDave Hannah
Jeff Phone #: ###-#### ok to stock after fire oks
FIRE-Final Inspection10/15/201210/19/201210/22/2012PNR
DetailsForrest France
BLD-Other10/16/201210/17/201210/17/2012APASS
DetailsDave Hannah
Celing grid- Eric Phone #: ###-####
FIRE-Conference10/12/201210/15/201210/16/2012PDONE
DetailsForrest France
On site conference with general contractor regarding project schedule, completion dates, and related FIR trade permit work.
BLD-Framing/Rough-in10/11/201210/12/201210/12/2012APASS
DetailsDave Hannah
Ceiling grid in the kitchen mid am please-Eric Phone #: ###-####
BLD-Other10/5/201210/5/201210/9/2012PCANC
DetailsDave Hannah
eric - ceiling Phone #: ###-####
BLD-Framing/Rough-in10/8/201210/8/201210/9/2012APART
DetailsDave Hannah
eric - ceiling Phone #: ###-#### ok to cover bakery criling after other trades ok
BLD-Other10/3/201210/4/201210/4/2012APASS
DetailsDave Hannah
eric Phone #: ###-#### - ceiling
BLD-Framing/Rough-in9/20/20129/21/20129/21/2012APASS
DetailsDave Hannah
Eric Phone #: ###-#### hanging soffitsin nw corner ok to cover
BLD-Conference9/6/20129/6/20129/6/2012PPASS
DetailsDave Hannah
eric Phone #: ###-#### ramp at back of store under 1 in 12 ok
BLD-Framing/Rough-in9/4/20129/5/20129/6/2012APART
DetailsDave Hannah
soffits and framing under the mezzanine//Eric Phone #: ###-#### soffits under mezz.ok to cover
BLD-Framing/Rough-in8/23/20128/23/20128/23/2012PPASS
DetailsDave Hannah
ok to cover upper and lower office areas walls around and in back of frezzers
BLD-Conference8/22/20128/23/20128/23/2012APASS
DetailsDave Hannah
Tyler Phone #: ###-####
BLD-Framing/Rough-in7/18/20127/18/20127/20/2012PPART
DetailsDave Hannah
Eriic Biggs Phone #: ###-#### ok to sheet rock areas for elec panels