Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-01196
StatusFinaled
Name HC COMPANY INC
Site Address 251 E FRONT ST Unit: 110
Project NameONE FRONT ST-1ST FLR
Customer Number 
ePlanReviewYes
Description
(INTERMOUNTAIN EYE)(ONE FRONT STREET – 1ST FLR – Ste#110) To remodel and existing 3,547 sq.ft. office by rearranging interior nonbearing walls to reconfigure the space. All work is to be conducted in accordance with the approved plans. Work includes: [construction of noncombustible partitions to create 6 exam areas, a retail area, 2 waiting areas, a reception area, and other accessory areas], installation of new lighting, new mechanical duct work only, new doors / accessible hardware, new plumbing, an accessible counter, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/20/20129/20/20129/20/2012PPASS
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection9/19/20129/20/20129/20/2012APASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Sprinkler Rough-in9/17/20129/17/20129/17/2012PPART
DetailsForrest France
Fire sprinkler work ready for final.
BLD-Framing/Rough-in8/31/20128/31/20128/31/2012PPASS
DetailsTony Young
ceiling grid inspection please-Jason Phone #: ###-####
BLD-Other8/30/20128/30/20128/30/2012PPART
DetailsTom Arcoraci
Jason - ceiling Phone #: ###-#### no wires on return or supply repair and leave tile out in this area
BLD-Conference8/2/20128/3/20128/3/2012APART
DetailsJim Storey
Jason Phone #: ###-#### stud height ok per listing of studs used. ok to cover all locations except plm resubmital aproval and fixture removal to acomadate pump sys. void at top of coridor wall to be patched/ top of wall bracing 48 oc to be added. all able to be insp. at ceilling.
BLD-Framing/Rough-in7/24/20127/25/20127/25/2012ANR
DetailsDave Hannah
Jason Phone #: ###-####