Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-01227
StatusFinaled
Name COLE COMMUNITY CHURCH INC
Site Address 8775 W USTICK RD
Project NameCOLE VALLEY CHRISTIAN SCHOOL
Customer Number 
ePlanReviewNo
Description
(COLE COMMUNITY CHRUCH AND COLE VALLEY CHRISTIAN SCHOOL) To remodel a 693 square foot administration office area in an existing 34,410 square foot church / school (Given occupancy under BLD11-02477). Work is to include: construction of new walls within existing office area to rearrange office space, installation of a new RTU, new lighting, installation of new accessible doors / hardware, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20128/8/20128/8/2012PPASS
DetailsJim Sly
Jeremy-PLease call at least 40 mins prior to inspection Phone #: ###-####
C/C issued.
DOC - Permit Finaled8/8/20128/8/20128/8/2012PPASS
DetailsJim Sly
FIRE-Final Inspection8/7/20128/8/20128/8/2012APASS
DetailsTroy Cobbley
life safety passed. Smoke detector in the closet is not required as per plan review research.
BLD-Final8/1/20128/3/20128/3/2012PCANC
DetailsJim Sly
Jeremy Phone #: ###-####
BLD-Framing/Rough-in7/5/20127/6/20127/6/2012PPASS
DetailsJim Sly
jeremy Phone #: ###-####