FIRE-Final Inspection | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Dave Hannah
|
|
|
Please call an hour prior to arrival if at all possible. Thanks, Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Sprinkler Rough-in | 11/20/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Forrest France
|
|
|
Project related fire sprinkler permit finaled.
|
BLD-Framing/Rough-in | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Dave Hannah
|
|
|
Inspecting rooms 910, 911A, 911B, 912. Rooms are located on the 9th floor next to the main elevator lobby. Plans are located at the reception desk on the 10th floor. Please call with any questions. Thanks, Chris Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 9/14/2012 | 9/14/2012 | 9/17/2012 | P | PASS |
Dave Hannah
|
|
|
Plans and permit at the reception desk on the 10th floor. Inspecting wall framing in rooms 1051, 1052, 957, 958. Please call Chris approx 1 hr prior to arrival if at all possible. Thank You. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|