BLD-Final | 11/13/2012 | 11/13/2012 | 11/13/2012 | P | PASS |
Jim Storey
|
|
|
Jorgan Phone #: ###-#### final ok
|
FIRE-Final Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled. C/N items finished.
|
BLD-Final | 9/26/2012 | 10/1/2012 | 10/1/2012 | P | PART |
Jim Storey
|
|
|
Paul Phone #: ###-#### 2 hr wall infilled ok 1 1/2 door instal ok. final pending fire spk aproval.
|
FIRE-Final Inspection | 9/26/2012 | 10/1/2012 | 10/1/2012 | A | FAIL |
Forrest France
|
|
|
Correction items are finished with the exception of fire sprinkler permit work to repair coverage deficiencies.
|
BLD-Final | 6/8/2012 | 6/11/2012 | 6/13/2012 | P | NR |
Jim Storey
|
|
|
Jorgan - call 30 mins prior Phone #: ###-####
|
FIRE-Final Inspection | 6/8/2012 | 6/11/2012 | 6/11/2012 | A | FAIL |
Forrest France
|
|
|
Several correction items noted including exit hardware issues, address and signage items, overspaced fire sprinkler coverage, incorrect door swing, unprotected openings in the 2 hour rated wall, racking permit required, etc. No corrections listed for the north building.
|