Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD12-01330
StatusFinaled
Name HOFFMAN CONSTRUCTION COMPANY
Site Address 1000 W MYRTLE ST
Project NameJUMP - BELOW GRADE PARKING
Customer Number 
ePlanReviewNo
Description
(JUMP - BELOW GRADE PARKING GARAGE) - To construct a new 295,000 square foot, below grade, concrete parking garage and related site improvements. The parking garage concrete lid will be covered with a minimum of 18 inches of soil and sod. This garage will be fully fire sprinkled. This permit is for the below grade parking garage only. There has been no review or approval for any above grade buildings or structures. 12/18/2012 - This permit was modified to include the installation of the tower crane concrete support foundation. 9/25/2013 - This permit was modified to construct an approximate 900 square foot underground concrete utility meter room on the west end of the existing underground parking garage. All construction per the approved plans and attached comment list. JCM **REFER TO ESC12-00403**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/26/20181/26/20181/26/2018PPASS
DetailsDave Hannah
Victoria Phone #: ###-####
FIRE-Final Inspection1/25/20181/26/20181/26/2018APASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Aging Inspection12/6/201712/6/201712/14/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection9/25/20179/25/201710/3/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection7/24/20177/24/20177/28/2017 PASS
DetailsDave Hannah
BLD-Aging Inspection5/22/20175/22/20175/30/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection3/20/20173/20/20173/28/2017 PEND
DetailsDave Hannah
BLD-Final1/17/20171/17/20171/17/2017PPART
DetailsDave Hannah
Requesting TCO for entire garage. Phone #: ###-#### Inspection requested via web by Joe Borelli ok for tco on entire garage
BLD-Final11/16/201611/16/201611/16/2016APART
DetailsDave Hannah
Requesting TCO for below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli ok to use the nw section
FIRE-Final Inspection11/16/201611/16/201611/16/2016APART
DetailsJim Page
Partial final for life fire safety TCO complete, final fire sprinkler inspection complete for below grade parking, fire alarm system has been tested and accepted for TCO, at this time the JUMP fire panel and the Simplot Headquarters fire panel are not integrated together for parking garage notification, this will need to be completed for FIR and BLD permit finals, fire extinguishers are in place with current inspection tags, knox box is in place by fire command, egress/exit lighting has been tested/inspected. Noted that temporary stairs are still in place by the annex stariwell in the parking garage, TCO will be subject to building inspection acceptance of stairs due to this being an egress point. All area's associated with the BLD and FIR permits will be subject to a final walk through prior to permit final to verify no alterations have been made to items accepted for TCO in regards to life fire safety.
BLD-Final11/15/201611/15/201611/16/2016PCANC
DetailsDave Hannah
Requesting TCO for below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli
FIRE-Final Inspection11/15/201611/15/201611/15/2016PCANC
DetailsJim Page
Inspection request rescheduled for 16NOV2016
FIRE-Alarm Testing11/10/201611/14/201611/14/2016ACANC
DetailsJim Page
Alarm testing was for simplot world headquarters parking level.
BLD-Conference11/3/201611/4/201611/4/2016APEND
DetailsDave Hannah
Requesting walk through and TCO status review of below grade garage. Phone #: ###-#### Inspection requested via web by Joe Borelli
BLD-Framing/Rough-in9/8/20169/9/20169/9/2016APASS
DetailsDave Hannah
Armondo-please call 20 minutes prior to meet-garage expansion in baseement-3 bathrooms Phone #: ###-####
BLD-Framing/Rough-in2/18/20162/18/20162/19/2016PPART
DetailsDave Hannah
garage expansion... call 15 mintues before to meet // Nel Phone #: ###-#### shaft in basement ok to cover
BLD-Framing/Rough-in12/17/201512/18/201512/18/2015APASS
DetailsDave Hannah
Garage expantion // Nyl Phone #: ###-#### ok to cover shafts in basement large air handlers
BLD-Framing/Rough-in12/10/201512/11/201512/11/2015APART
DetailsDave Hannah
Neil Phone #: ###-#### looked at shafts and wall and ceiling furring ok to cover
BLD-Framing/Rough-in11/4/201511/5/201511/5/2015APASS
DetailsMike Jordan
Interior stel stud fur outs in basement, as well as top of wall firecaulking.
BLD-Framing/Rough-in11/3/201511/4/201511/4/2015ACANC
DetailsMike Jordan
Neal Phone #: ###-####
BLD-Concrete3/7/20133/12/20133/15/2013APASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/13/20133/15/2013APASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/14/20133/15/2013PPASS
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/8/20133/13/2013APASS
DetailsDave Hannah
pressure slab/foundation/columns/wall concrete placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete3/7/20133/11/20133/12/2013PPART
DetailsDave Hannah
column/wall placements Phone #: ###-#### >> Inspection requested via web by Brian Murphy slab on grade ane wall ok spec strata on site
BLD-Concrete3/7/20133/7/20133/12/2013PPASS
DetailsDave Hannah
pressure slab/foundation Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/20/20132/22/20132/22/2013APART
DetailsDave Hannah
rebar coupler installation Phone #: ###-#### >> Inspection requested via web by Brian Murphy couplers have not been started but crews are placeing concrete on second deck puor
BLD-Concrete2/20/20132/21/20132/22/2013PPART
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew working on rebar and inbeds al with mti will do final rebar inspection befor concrete placement.
BLD-Concrete2/20/20132/21/20132/21/2013APART
DetailsDave Hannah
elevated slab placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew still working on rebar second elev slab Al with mti will do final rebar placement inspection
BLD-Concrete2/11/20132/12/20132/14/2013PPASS
DetailsDave Hannah
Helix Core wall concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/13/20132/14/2013APASS
DetailsDave Hannah
Excterior Wall Placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/13/20132/14/2013PPASS
DetailsDave Hannah
Slab on Grade concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete2/11/20132/11/20132/12/2013PPASS
DetailsDave Hannah
Elevated Slab concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/29/20131/29/20131/30/2013ACANC
DetailsDave Hannah
BLD-Concrete1/28/20131/28/20131/30/2013ACANC
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/23/20131/25/20131/28/2013APART
DetailsDave Hannah
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete1/23/20131/24/20131/24/2013APART
DetailsTom Arcoraci
slab/foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy wip
BLD-Concrete12/27/20121/2/20131/2/2013APART
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/27/201212/28/201212/28/2012PPART
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/27/201212/28/201212/28/2012APASS
DetailsDave Hannah
foundation wall, tower crane foundation. Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/18/201212/18/201212/19/2012PPASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/17/201212/18/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/14/201212/14/2012APART
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/13/201212/13/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete12/10/201212/12/201212/12/2012APART
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy walked project with spec inspector crews are placing concrete 700 yards for core foundation
BLD-Concrete12/10/201212/11/201212/11/2012APASS
DetailsDave Hannah
slab/foundation concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crew placing section by office
BLD-Concrete11/30/201212/7/201212/7/2012APART
DetailsDave Hannah
wall/slab foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy crews working on rebar
BLD-Concrete11/30/201212/6/201212/6/2012APART
DetailsDave Hannah
wall/slab foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/5/201212/6/2012ACANC
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/4/201212/5/2012APART
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Concrete11/30/201212/3/201212/4/2012APART
DetailsDave Hannah
wall foundation placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/30/201212/3/2012APASS
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/29/201211/30/2012APASS
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/27/201211/28/201211/29/2012ACANC
DetailsDave Hannah
foundation wall rebar/concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/21/201211/28/201211/29/2012PPART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy meet with spec insp walked site wall ok
BLD-Foundation11/21/201211/27/201211/28/2012APART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/21/201211/26/201211/28/2012APART
DetailsDave Hannah
perimeter wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy wall along 9th SPEC .INSP OKED
BLD-Concrete11/21/201211/26/201211/28/2012APART
DetailsDave Hannah
pressure slab placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/13/201211/15/201211/15/2012PPASS
DetailsTom Arcoraci
slab/foundation rebar and concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy
BLD-Foundation11/13/201211/15/201211/15/2012APART
DetailsMike Jordan
vault wall rebar concrete Phone #: ###-#### >> Inspection requested via web by Brian Murphy. work in progress on vault wall. Ok to place after special inspection final approval.
BLD-Conference11/13/201211/15/201211/13/2012PCANC
DetailsDave Hannah
vault wall rebar/ concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy Inspection cancelled from web by: Brian Murphy
BLD-Conference11/13/201211/15/201211/13/2012ACANC
DetailsDave Hannah
slab footing concrete placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy Inspection cancelled from web by: Brian Murphy
BLD-Foundation11/1/201211/2/201211/6/2012APART
DetailsDave Hannah
foundation /slab on grade concrete placement fri 11-2 8am Phone #: ###-#### >> Inspection requested via web by Brian Murphy second slab pour along east end of project ok to place
BLD-Foundation10/18/201210/19/201210/22/2012APART
DetailsDave Hannah
Brian Murphy Phone #: ###-#### todate crews have been working on under ground plumbing and elec they have also been placing concrete for elev and elec pits
BLD-Footing10/18/201210/19/201210/22/2012APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Brian Murphy first section of basement parking garage slab and column footings
BLD-Concrete12/27/20121/3/2013 A 
DetailsDave Hannah
foundation wall, columns Phone #: ###-#### >> Inspection requested via web by Brian Murphy