BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PASS |
Tom Arcoraci
|
|
|
daryl Phone #: ###-####
|
FIRE-Final Inspection | 3/10/2014 | 3/11/2014 | 3/11/2014 | A | PASS |
Forrest France
|
|
|
Verified correction items. Fire life safety passed.
|
FIRE-Final Inspection | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | FAIL |
Forrest France
|
|
|
Missing two exit signs, one EM light per plan sheet E3.0. Need to provide revised floorplan due to field changes.
|
BLD-Framing/Rough-in | 1/7/2014 | 1/7/2014 | 1/9/2014 | P | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/11/2013 | 12/11/2013 | 12/12/2013 | P | PASS |
Dave Hannah
|
|
|
daryl - needs to be done before 3 pm Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2013 | 11/14/2013 | 11/15/2013 | P | PART |
Dave Hannah
|
|
|
Before 3 if possible - Daryl Phone #: ###-#### ok to cover phase one
|
BLD-Ceiling Grid Inspection | 11/5/2013 | 11/6/2013 | 11/6/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2013 | 10/23/2013 | 10/24/2013 | P | PASS |
Dave Hannah
|
|
|
partial - Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | CANC |
Dave Hannah
|
|
|
partial - Daryl Phone #: ###-####
|
BLD-Framing/Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 | A | PASS |
Dave Hannah
|
|
|
Daryl-Ceiling grid inspection please-Please call prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PART |
Dave Hannah
|
|
|
DARYL Phone #: ###-#### ok to cover phase one
|