Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD12-01528
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 100 E IDAHO ST
Project NameST. LUKES-MSTI-1st Floor-GYN
Customer Number 
ePlanReviewYes
Description
(ST. LUKES – MSTI – 1st Floor – GYN/ONC. Remodel) Permit is to remodel an existing 1,600 square foot medical office area. This permit is approved contingent upon adhering to the approved plans on file. Work includes: [construction of new interior non-bearing walls to create an exam room, a procedure room, an office, a new rated storage closet, and a new rated corridor wall], installation of new accessible doors / hardware, new millwork, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/11/20143/12/20143/12/2014APASS
DetailsTom Arcoraci
daryl Phone #: ###-####
FIRE-Final Inspection3/10/20143/11/20143/11/2014APASS
DetailsForrest France
Verified correction items. Fire life safety passed.
FIRE-Final Inspection3/4/20143/5/20143/5/2014AFAIL
DetailsForrest France
Missing two exit signs, one EM light per plan sheet E3.0. Need to provide revised floorplan due to field changes.
BLD-Framing/Rough-in1/7/20141/7/20141/9/2014PPASS
DetailsDave Hannah
Daryl Phone #: ###-####
BLD-Ceiling Grid Inspection12/11/201312/11/201312/12/2013PPASS
DetailsDave Hannah
daryl - needs to be done before 3 pm Phone #: ###-####
BLD-Framing/Rough-in11/14/201311/14/201311/15/2013PPART
DetailsDave Hannah
Before 3 if possible - Daryl Phone #: ###-#### ok to cover phase one
BLD-Ceiling Grid Inspection11/5/201311/6/201311/6/2013APASS
DetailsDave Hannah
Daryl Phone #: ###-####
BLD-Framing/Rough-in10/23/201310/23/201310/24/2013PPASS
DetailsDave Hannah
partial - Daryl Phone #: ###-####
BLD-Framing/Rough-in9/26/20139/27/20139/27/2013ACANC
DetailsDave Hannah
partial - Daryl Phone #: ###-####
BLD-Framing/Rough-in9/9/20139/10/20139/10/2013APASS
DetailsDave Hannah
Daryl-Ceiling grid inspection please-Please call prior to inspection Phone #: ###-####
BLD-Framing/Rough-in7/23/20137/24/20137/24/2013APART
DetailsDave Hannah
DARYL Phone #: ###-#### ok to cover phase one