Permit Information
Permit NumberBLD12-01694
StatusFinaled
Name REDWOOD BUILDING LLC
Site Address 13909 W WAINWRIGHT DR
Project NameCalm Office Bldg
Customer Number 
ePlanReviewNo
Description
(STAT PADS) To remodel two existing spaces for one tenant. The first space has 1,232 square feet. The second space has a total of 1,763 square feet. Both spaces combined have a total of 2,995 square feet and are located in an existing 10,958 square foot building constructed under BLD06-00102. Work to include: Demo select interior doors and walls per plans; infill a wall opening per plans; construct new interior walls to create a two new accessible restrooms, offices, conference room, storage room, break room, entry, and an open office room; install new interior doors and associated hardware per plans; install a new dual height (hi-lo) accessible drinking fountain; install a service sink; related interior finishes in compliance with chapter 8 of the 2009 IBC; Installation of a suspended ceiling system; install new entry store front glazing; installation of new lighting; and plumbing, electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved prior to tenant occupying this space. NOTE: "This building is fully Fire Sprinklered for area increases with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department." **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/5/201211/5/201211/5/2012PPASS
DetailsJim Sly
Matt Phone #: ###-####
OK for Perm Occ.
BLD-Final11/1/201211/2/201211/2/2012PFAIL
DetailsJim Storey
Matt Phone #: ###-#### mirror to high key note # 5
FIRE-Final Inspection10/31/201211/1/201211/2/2012APASS
DetailsTroy Cobbley
Permit finaled
FIRE-Final Inspection10/30/201210/31/201210/31/2012ACANC
DetailsTroy Cobbley
Project is not ready for a final inspection due to the ceiling tile not being installed. Contractor and I agreed to reschedule for tomorrow morning.
BLD-Ceiling Grid Inspection10/29/201210/30/201210/30/2012APASS
DetailsJim Sly
delray Phone #: ###-####
BLD-Framing/Rough-in9/13/20129/14/20129/14/2012APASS
DetailsJim Sly
del Phone #: ###-####
Framing pass....Still need Sprinkler approval.
BLD-Framing/Rough-in9/13/20129/13/20129/13/2012PNH
DetailsJim Sly
Dale Phone #: ###-####
Building locked....No access.