BLD-Final | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Mike Jordan
|
|
|
contact 1/2 hr prior//Darren Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 4/26/2013 | 4/30/2013 | 4/30/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | DONE |
Mike Jordan
|
|
|
please call 1/2 hr prior//Darren Phone #: ###-####
|
FIRE-Conference | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | DONE |
Troy Cobbley
|
|
|
Darrin, myself and a gentleman from Enterprise Electric dicussed and agreed that emergency lighting, below the mezzanine would be modified from what has been installed. We agreed that three lights would be installed in each of the three long corridors and one light would be installed in the short corridors. This was decided after readings from a light meter.
|
FIRE-Conference | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | DONE |
Troy Cobbley
|
|
|
darren and I discussed fire extinguisher placement, addressing, facp room signage and emergency lighting
|
BLD-Framing/Rough-in | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Mike Jordan
|
|
|
please call 30min prior - darrin Phone #: ###-####. Blocking added to framing for exterior sign at nw end of bldg as per approved plans.
|
BLD-Framing/Rough-in | 4/4/2013 | 4/9/2013 | 4/9/2013 | A | PART |
Mike Jordan
|
|
|
call 1/2 hr prior//Jason Phone #: ###-####. Exterior steel stud framing for signatnwcorner of building. Need RFI from engineer of record showing the strapping at 4ft. oc. in leiu of steel studs. Ok pending electrical ri inspection.
|
BLD-Energy code compliance | 1/17/2013 | 1/18/2013 | 1/22/2013 | A | PASS |
Jim Sly
|
|
|
Darren Phone #: ###-#### All framing OK
|
BLD-Framing/Rough-in | 1/16/2013 | 1/17/2013 | 1/17/2013 | A | PART |
Jim Sly
|
|
|
Darren-PLease call at least 30 mins prior to inspection Phone #: ###-#### Exterior walls OK to insulate.... Need to see Engineering for Rest room and mezzanine framing.
|
BLD-Conference | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Mike Jordan
|
|
|
Reviewed special inspection reports and all work that is in progress.
|
BLD-Other | 11/9/2012 | 11/9/2012 | 11/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
steve Phone #: ###-#### - rebar brad from mti on site 408
|