Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD12-01724
StatusFinaled
Name UPSON COMPANY
Site Address 2401 W TARGEE ST
Project NameHawthorne Elementary School
Customer Number 
ePlanReviewYes
Description
(HAWTHORNE ELEMENTARY) Remove the existing asphalt roofing system down to the roof sheathing and replace with a metal roof covering system. Add blocking between the overbuild trusses added in the late 1980's above the GLB supporting those trusses. Plan scope of work modified 12/11/12 - Concrete collars originally indicated to be installed at grade around the existing concrete columns, as shown on deleted original Sheet A3.5, have been deleted from scope of work due to lack of funding and review and written statements from Arch & Eng that they were voluntary upgrade and not required upgrade (copy attached). All materials, connections, bracing and re-roof materials as indicated on the reviewed plans. All work shall be done per approved plans and product manufactures detailed installation instructions.Contractor to have a copy of the manufacture’s installation instructions at the job site, for review by and too aide project inspection and approval by the Boise City Structural Building Inspector. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20134/11/20134/11/2013PPASS
DetailsJim Storey
Upson Co. contact is Jason Webster if there are questions. Phone #: ###-#### >> Inspection requested via web by justin barker l/c
DOC - Permit Finaled4/11/20134/11/20134/11/2013PPASS
DetailsJim Storey
BLD-Framing/Rough-in1/3/20131/3/20131/3/2013PPASS
DetailsJim Storey
tommy Phone #: ###-#### sheer wall ok
BLD-Final12/28/20121/3/20131/3/2013ANR
DetailsJim Storey
tommy Phone #: ###-####
BLD-Framing/Rough-in11/7/201211/7/201212/11/2012PPASS
DetailsJim Storey
b wing ok
BLD-Other10/30/201210/30/201212/11/2012PPASS
DetailsTom Arcoraci
a wing ok