Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD12-01734
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 100 E IDAHO ST
Project NameMSTI PEDS 1st Floor
Customer Number 
ePlanReviewYes
Description
(ST LUKES - MSTI PEDS - 1ST STORY CCI CLINIC) This building has a fire sprinkler system because it has stories more than 55 feet above grade. To remodel a 5,787 square foot area located on the 1st story of the MSTI building to be used as a medical outpatient clinic. This area is considered to be a separate tenant space from the rest of the building. Work is to include interior nonbearing walls, 4 single user toilet rooms accessible to the disabled, suspended acoustical ceilings, gypsum board soffits, interior doors, millwork, and finishes. An existing exterior door will be replaced with an exterior window and wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201310/22/201310/22/2013APASS
DetailsDave Hannah
Daryl Phone #: ###-####
FIRE-Final Inspection10/18/201310/18/201310/18/2013PPASS
DetailsForrest France
Fire life safety passed final inspection. Exit sign at the SE access repaired while on site.
BLD-Ceiling Grid Inspection9/26/20139/27/20139/27/2013APASS
DetailsDave Hannah
Daryl Phone #: ###-####
BLD-Framing/Rough-in7/26/20137/29/20137/30/2013APASS
DetailsDave Hannah
final framing phase - daryl Phone #: ###-####9
BLD-Final6/6/20136/7/20136/7/2013APART
DetailsTony Young
daryl Phone #: ###-####,, temp occupancy on phase 2 ok
FIRE-Final Inspection6/3/20136/4/20136/4/2013APART
DetailsForrest France
"Phase two" partial fire life safety inspection completed. Provide ceiling tile at the soiled utility room.
BLD-Ceiling Grid Inspection5/1/20135/3/20135/3/2013APASS
DetailsDave Hannah
daryl Phone #: ###-####
BLD-Framing/Rough-in3/5/20133/6/20133/6/2013APASS
DetailsDave Hannah
daryl Phone #: ###-#### ok to cover walls phase two
BLD-Final1/22/20131/23/20131/23/2013APART
DetailsTom Arcoraci
daryl Phone #: ###-#### phase one ok
FIRE-Final Inspection1/18/20131/22/20131/22/2013APART
DetailsForrest France
Project "phase one" area fire life safety okayed.
FIRE-Final Inspection1/15/20131/16/20131/16/2013ANR
DetailsForrest France
Missing fire life safety provisions at the east exit/entryway.
FIRE-Conference1/15/20131/15/20131/15/2013PDONE
DetailsForrest France
Regarding project phases.
FIRE-Sprinkler Rough-in12/11/201212/11/201212/11/2012APART
DetailsForrest France
Ref. approved fire sprinkler plans for locations okayed to date.
BLD-Ceiling Grid Inspection11/29/201211/30/201211/30/2012APART
DetailsDave Hannah
Daryl Phone #: ###-#### ok to cover ceiling in first phase
BLD-Framing/Rough-in10/3/201210/4/201210/4/2012APART
DetailsDave Hannah
Daryl Phone #: ###-#### phase one ok to cover walls