Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-01747
StatusFinaled
Name J & B CONSTRUCTION LLC
Site Address 350 N MILWAUKEE ST
Project NameBTS-EXTERIOR REMODEL
Customer Number 
ePlanReviewNo
Description
(BTS-EXTERIOR FACADE REMODEL) Perform select structural demolition of beams, columns, walls and roof joist / roofing systems at west face of tenant space located between the lower level main mall entry and mall to the North, Penny's to the East and The Cheese Cake Factory to the South. Add new structural footings / foundation, steel columns, beams; non-combustible high parapet wall framing, high wall bracing, exterior EIFS and metal wall panel system on furring over weather barrier over Dens Glass sheathing on the steel frame; maintain and add to height of existing 2-hour fire wall between the future H&M retail and existing Cheese Cake Factory tenant spaces; with limited, site, electrical and sprinkler system work, all in preparation for new tenant, H & M retail. Tenant improvement for H&M retail will be under separate permits currently submitted for review. Special inspection required for concrete, welding, steel, epoxy anchor systems for concrete and masonry. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/19/201211/19/201211/19/2012PPASS
DetailsMike Jordan
Jeremy Phone #: ###-####
DOC - Permit Finaled11/19/201211/19/201211/19/2012PPASS
DetailsMike Jordan
FIRE-Final Inspection11/16/201211/19/201211/19/2012APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection11/16/201211/16/201211/16/2012PCANC
DetailsTroy Cobbley
Overbooked. Jeremy is going to reschedule for monday morning. Phone #: ###-####
BLD-Framing/Rough-in8/29/20128/30/20128/30/2012APASS
DetailsMike Jordan
Jeremy Phone #: ###-####. Exterior steel studs for storefront, west elevation only.